Laserfiche WebLink
Chapter III <br /> PRODUCTS,MEETINGS AND SCHEDULE <br /> P P P <br /> A. Products <br /> We will submit the following products to the County: <br /> 1. Administrative Draft IS/MND: 5 bound and 1 unbound copy to County <br /> 2. Screencheck Draft: 1 copy to County <br /> 3. Draft IS/MND: 50 bound and 1 unbound copy to County* <br /> 4. PDF version of Initial Study for County's website <br /> *A master,camera-ready copy for printing of all final documents and a diskette will be submitted to the County. <br /> B. Meetings and Hearings <br /> Amy Skewes-Cox will attend two public hearings and up to four meetings with the County. <br /> Optional meetings could be attended on a time-and-materials basis. One site visit is also included. <br /> C. Schedule <br /> Our proposed work schedule for the IS/MND is shown in Table 1. However, we remain flexible <br /> and are willing to revise the schedule to meet the County's needs should this be necessary. Com- <br /> pliance with this schedule is highly dependent on the timely submittal of materials by all EIR team <br /> members, and review by County staff. The schedule below assumes a start date of August 1, <br /> 2006. The main determinant for the schedule is the fact that 12 to 14 weeks are required for the <br /> TJKM traffic analysis and Ms. Skewes-Cox is on vacation from June 21 to 26, July 3-7 and July <br /> 17 to 31. Therefore,much of the Initial Study is assumed to be done after August 1, 2006. During <br /> her absence,her colleague, Ms.Natalie Maoris, can be contacted if questions arise. <br /> 07/17/06 13 <br />