Laserfiche WebLink
design of public areas shall implement the common design theme for the neighborhood and <br /> shall be consistent with the MHCSD Design Manual, Roadway Landscape Plans, and/or <br /> other applicable neighborhood design criteria. [SPIT Implementation Measure 4.6 (12)] <br /> Timing: Improvement Plans, Building Permits <br /> 10. Edge Treatment: The applicant shall provide a minimum 5-foot increase in the width of the <br /> open space area east of Great Valley Parkway to accommodate a wider bicycle path and <br /> associated open space landscaping.The applicant shall also provide an additional 4-foot <br /> average increase in width to accommodate the horizontally undulating soundwall of 0 to 8 <br /> feet located at the right-of-way line. [Carryover of Condition#12 of COA's for Neighborhood <br /> E and G Tentative Maps{PA-0200423—Neighborhood E; PA-0200430—Neighborhood G)] <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to the Final Map for the <br /> subject area. <br /> 11. Second Unit Dwellings: Second unit dwellings shall be required on at least 6.5 %of the <br /> parcels within the R-VL, R-L, and R-M zoning districts consistent with the preliminary second <br /> unit plan approved with the Tentative Map. [SPIT Implementation Measure 3.3.7 (1); Master <br /> Plan Development Title Chapter 9-830M] The Applicant shall place the following note on <br /> Final Maps for recordation: <br /> "Second unit dwellings shall be required on at least 70 lots of the Tentative Map for <br /> Neighborhood H, consistent with the preliminary second unit plan approved with the <br /> tentative map and Chapter 9-830M of the San Joaquin County Development Title. The <br /> location of a second unit may be amended by Community Development Department <br /> approval only by designation of a replacement lot to receive the second unit. All <br /> replacement parcels must be located within the Tentative Maps for Neighborhoods I & J. <br /> Parcels for each residential subdivision within the R-VL, R-L, and R-M zoning districts <br /> shall be consistent with the preliminary second unit plan approved with the Tentative <br /> Maps.""Second unit dwellings shall be required as follows, consistent with the preliminary <br /> second unit plan approved with the tentative map and Chapter 9-830M of the San Joaquin <br /> County Development Title." <br /> Timing: Condition shall be met prior to recordation of each Final Map. <br /> 12. Multi-Family Development: Future site plans and improvement plans for the Medium-High <br /> Density("R/MH")and the High Density("R/H")parcels in Neighborhood H, and all tentative <br /> maps for multifamily housing, shall implement all applicable requirements of the Mountain <br /> House Master Plan and all other applicable Community Approvals. The R/MH and R/H sites <br /> in Neighborhood H shall be developed primarily as Senior Housing, unless the need for such <br /> housing is determined not to exist by the time Neighborhoods I and J are built out. [SPII <br /> Implementation Measure 3.3.8 (1)] <br /> Timing: Prior to or upon approval of subsequent Tentative Maps and other development <br /> permits for multi-family uses. <br /> 13. Neighborhood Centers: The site design of Neighborhood Centers shall be generally <br /> consistent with the conceptual designs shown in Specific Plan II, Figure 4.23 for <br /> Neighborhood H, subject to minor modifications during preparation of the applicable <br /> Tentative Map, Mountain House Community Services District("MHCHD") requirements, or <br /> Lammersville School District requirements. [SPII Implementation Measure 4.6 (2)] <br /> 14. Neighborhood Commercial Uses: The applicant shall reserve at least 50 percent of the <br /> Neighborhood Commercial area for retail commercial uses while other portions may be used <br /> for day care centers, recreation buildings, or meeting halls. Outdoor eating areas are <br /> 13 <br />