Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> Resources Board(CARB)Tier 4 <br /> Certified as set forth in Section 2423 <br /> of Title 13 of the California Code of <br /> Regulations,and Part 89 of Title 40 <br /> of the Code of Federal Regulations. <br /> • All construction equipment shall be <br /> maintained and properly tuned in <br /> accordance with manufacturers' <br /> specifications. Equipment <br /> maintenance records shall be kept <br /> on-site and made available upon <br /> request by the SJVAPCD or the <br /> County. <br /> • The Project applicant shall comply <br /> with all applicable SJVAPCD rules <br /> and regulations.Copies of any <br /> applicable air quality permits and/or <br /> monitoring plans shall be provided <br /> to the County. <br /> 4.5-2b: Prepare Air Impact Assessment Action: San Joaquin County/ San Joaquin County SJVAPCD <br /> to Reduce Operational NOx Emissions Prepare an Air Construction Contractor <br /> In accordance with SJVAPCD Rule 9510,a Impact <br /> detailed air impact assessment shall be Assessment. <br /> prepared detailing the operational <br /> characteristics associated with the Proposed Timing: <br /> Initials Initials <br /> Project. In accordance with this rule, Prior to the <br /> operational emissions of NO«shall be reduced issuance of <br /> by a minimum of 33.3 percent and operational building permits. <br /> emissions of PM10 must be reduced by a <br /> minimum of 50 percent over a period of ten Date Date <br /> years.(Emissions reductions are in <br /> comparison to the Project's operational <br /> baseline emissions presented in Table 4.5-6.) <br /> The Project would demonstrate compliance <br /> with Rule 9510,including payment of all <br /> Section 1.0 Introduction 4 August 2022 <br />