Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> applicable fees,before issuance of the first <br /> building permit. <br /> Based on the findings of the air impact <br /> assessment,the applicant shall pay the <br /> SJVAPCD a monetary sum necessary to offset <br /> the required operational emissions that are not <br /> reduced by the emission reduction measures <br /> contained in the air impact assessment.The <br /> quantity of operational emissions that need to <br /> be offset will be calculated in accordance with <br /> the methodologies identified in Rule 9510, <br /> Indirect Source Review,and approved by the <br /> SJVAPCD.Operational emissions reduction <br /> methods will be selected under the direction of <br /> the SJVAPCD according to the air impact <br /> assessment process detailed in,and required <br /> by Rule 9510, Indirect Source Review(see <br /> Rule 9510,subsection 5). <br /> Biological Resources <br /> 4.6-1 a: Conduct Environmental Action: Project Biologist/ San Joaquin County <br /> Awareness Training for Construction Environmental Construction Contractor <br /> Personnel. Awareness <br /> Before any construction work occurs on the Training for <br /> Project site,including grading,tree and/or construction <br /> vegetation removal(clear and grub),the personnel. <br /> County shall retain a qualified biologist Initials Initials <br /> (familiar with the resources in the area)to Timing: <br /> conduct a mandatory contractor/worker Prior to <br /> environmental awareness training for Construction. <br /> construction personnel.The awareness <br /> training will be provided to all construction Date Date <br /> personnel(contractors and subcontractors) <br /> prior to beginning construction to brief them on <br /> Section 1.0 Introduction 5 August 2022 <br />