Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> suitable habitat.Relocation methods shall be <br /> approved by CDFW. <br /> 4.6-1 e: Protect Water Quality and Action: Construction Contractor San Joaquin County <br /> Minimize Sedimentation Runoff to Non- <br /> Wetland Waters(Woodbridge Irrigation Comply with water <br /> quality BMPs. <br /> Canal). <br /> Project construction shall comply with all Timing: <br /> Initials Initials <br /> construction site BMPs specified in the Storm Prior to and during <br /> Water Pollution Prevention Plan,and any other construction. <br /> permit conditions to minimize the introduction Date Date <br /> of construction-related contaminants and <br /> mobilization of sediment to non-wetland <br /> waters in and adjacent to the project area. <br /> These BMPs will address soil stabilization, <br /> sediment control,wind erosion control,vehicle <br /> tracking control,non-stormwater management, <br /> and waste management practices.The BMPs <br /> will be based on the best conventional and <br /> best available technology. <br /> 4.6.1f: Giant Garter Snake. Action: Project Biologist/ San Joaquin County SJCOG <br /> Prior to ground disturbance within 200 feet of Avoid impacts to Construction Contractor <br /> the Woodbridge Irrigation District canal, giant garter snake. <br /> consistent with the SJMSCP,the following Timing: <br /> actions shall be implemented to avoid potential Initials Initials <br /> impacts to giant garter snake: Prior to ground <br /> • Construction shall occur during the disturbance within <br /> active period for the snake,between 200 feet of the Date Date <br /> May 1 and October 1.SJCOG,with Woodbridge <br /> concurrence of the permitting Irrigation District <br /> Agencies,shall determine if canal. <br /> additional measures are necessary <br /> to minimize and avoid take for <br /> construction between October 2 and <br /> Section 1.0 Introduction 9 August 2022 <br />