Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> • If Sanford's arrowhead are found, <br /> Environmentally Sensitive Areas(ESAs)shall <br /> be established around the plants as necessary <br /> to clearly demarcate areas for avoidance <br /> consistent with Mitigation Measure 4.6-1 b. <br /> Avoidance measures and the specific <br /> avoidance zone distance would be determined <br /> in coordination with appropriate resource <br /> agencies(CDFW and/or USFWS). <br /> • If Sanford's arrowhead are found <br /> and avoidance of the species is not possible, <br /> additional measures such as seed collection <br /> and/or translocation may be developed in <br /> consultation with the appropriate agencies. <br /> • If no Sanford's arrowhead are <br /> found,no further measures pertaining to <br /> special-status plants are necessary. <br /> 4.6.1 d: Western Pond Turtle. Action: Project Biologist San Joaquin County CDFW <br /> The following actions shall be implemented to Western pond turtle <br /> avoid impacts to western pond turtle. surveys. <br /> • A western pond turtle Timing: <br /> preconstruction survey shall be conducted by Prior to <br /> a qualified biologist within 14 days prior to the construction Initials Initials <br /> initiation of ground disturbance(e.g., ground <br /> tree/vegetation removal,mass grading).The disturbance. <br /> survey shall consist of the entire Project site, Date Date <br /> including accessible areas within 100 feet <br /> (where feasible). <br /> • If individual western pond turtles are <br /> found during the preconstruction survey,a <br /> qualified biologist with a CDFW Scientific <br /> Collecting Permit shall relocate the individuals, <br /> with the concurrence of CDFW,to a site with <br /> Section 1.0 Introduction 8 August 2022 <br />