Laserfiche WebLink
7) Check that all testing and maintenance has been completed and documented. 8) Verify that all facility <br /> employees have been trained in accordance with 23 CCR 2715(c). 9) The owner/operator sign and date the <br /> Designated Underground Storage Tank Operator Visual Inspection Report within 72 hours of being provided a <br /> signed copy. OBSERVATION: The designated operator failed to check and note all required items on the visual <br /> inspection reports. The incorrect and missing information included the following from the inspection reports: - <br /> The DO reports of 11/1/2021, 9/3/2021, 8/6/2021, 5/22/2022, 4/22/22, 3/25/2022, 2/25/2022 and 1/28/2022 <br /> did not include the owner/operator name, signature and date signed. -The DO reports of 12/31/2021, <br /> 12/01/2021, 10/03/2021, 07/08/2021 and 06/09/2021 did not include the owner/operator name. -The DO <br /> report of 11/01/2021 did not include follow up actions in section 5 to compliance issues from section 3 <br /> REGULATION GUIDANCE: During the visual inspection, the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the <br /> report. <br /> Corrective Action <br /> Ensure that designated operators performing visual inspections at this facility are including all the required <br /> information on the reports <br /> Response <br /> RTC form was signed and submitted 6/02/2022—see attachments Fast Easy Mart 103 RTC & corrective action <br /> 060222 (page 3) and Fast Easy Mart 103 DO visual inspection report 060921-052222. Designated operator has <br /> been instructed to fully complete all required information on the reports, and facility operator will check and <br /> sign reports going forward. <br /> Violation #214 <br /> Failure to comply with any of the applicable requirements of the permit issued for the operation of the UST <br /> system. OBSERVATION: The facility is not in compliance with the written conditions of the operating permit. <br /> The overfill prevention equipment testing due by 10/2021 has not been conducted. REGULATION GUIDANCE: <br /> The owner and operator of underground storage tank (UST) systems shall comply with all requirements of the <br /> permit issued for the operation of the UST system. <br /> Corrective Action <br /> Immediately take all necessary actions to bring these UST systems into compliance. Schedule for overfill <br /> prevention equipment testing now. <br /> Response <br /> RTC form was signed and submitted 6/02/2022—see attachments Fast Easy Mart 103 RTC & corrective action <br /> 060222 (page 4) and Fast Easy Mart Stockton Full OPEI Report 2021-10-19. Next inspection is due by <br /> 10/19/2024 and will be conducted prior to that date with OPEI Report forwarded to CUPA when received. <br /> Violation #209 <br /> Failure to maintain a copy of the "Facility Employee Training Certificate" on-site or off-site at a readily <br /> available location, if approved by the UPA. <br /> Corrective Action <br /> Update the Facility Employee Training Certificate to contain the accurate information and submit a copy of the <br /> updated form to the EHD. <br /> 2 <br />