Laserfiche WebLink
r <br /> " ° COUNTY OF SAN JOAQUIN <br /> �.•�'•.oG THOMAS R.FLINN <br /> a + DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> R O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> •' STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> OqC/P O R�`PDEPUTY DIRECTOR <br /> FAX:209/468 2999 <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> December 7, 1999 D E G 8 11999 <br /> MEMORANDUM COMMUnity Development Dept <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineer CrK <br /> Public Services Division <br /> SUBJECT: SA-99-87(PRE-APPLICATION) A SITE APPROVAL PRE-APPLICATION TO <br /> REMODEL A PORTION OF AN EXISTING BUILDING FOR TACO TAKE-OUT, <br /> LOCATED ON THE SOUTH SIDE OF STATE HIGHWAY ROUTE 26, 1,000 FEET <br /> EAST OF MILL STREET, LINDEN. (DISTRICT 4) <br /> APPLICANT: George and Josephine Gerlomes APN: 105-170-05 <br /> INFORMATION: <br /> The site not currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. <br /> State Highway Route 26 has an existing right-of-way width of 80 feet and a planned right-of-way width <br /> per Caltrans. <br /> RECOMMENDATIONS: <br /> 1. Any dedications, improvements or permits for State Highway Route 26 shall be as required by <br /> Caltrans. <br /> 2. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $3,406 per 1,000 gross <br /> square foot of building as retail service in the Linden area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025,R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RH:gn <br /> PS-9L035-GIC <br /> E: Manuel Lopez, Deputy Director/Development <br />