Laserfiche WebLink
S. CALTRANS: <br /> a. A 50-foot building setback is required along the western property line of Lots 1 and 7. <br /> 6. PACIFIC GAS & ELECTRIC: <br /> a. Ten-foot-wide public utility easements shall be dedicated along the perimeter of all streets <br /> of the subdivision. <br /> b. Any existing PG&E facilities affected by the project will be relocated or placed <br /> underground at the owner's or developer's expense. <br /> NOTE: On November 19, 1992,the San Joaquin County Planning Commission approved SU-92-9 subject <br /> to the Conditions of Approval listed above. <br /> Conditions of Approval - 5 - SU-92-9 <br />