My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (MAY)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (MAY)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:38 PM
Creation date
6/21/2022 2:10:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (MAY)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ekienvironment <br />& water <br />1.5 Site Redevelopment Activities <br />As shown on Figure 1-3, the proposed Site redevelopment includes the construction of the <br />following buildings for commercial/industrial use: (a) an expansion of the rail dock facility on <br />the southeast corner of the main building, (b) a 731,000 +/- sf building in the eastern portion of <br />the Site that will be part of Kraft Heinz's expanded facility, (c) two buildings of approximately <br />58,500 sf each on the northwestern portion of the Site, and (d) a 87,500 +/- sf building in the <br />northeast corner of the Site. The Site's rail spur will be rerouted on-site to accommodate <br />building construction. After redevelopment, the Site will be predominantly covered by <br />buildings or hardscape with the exception of a stormwater detention basin in the southeast <br />corner of the Site. <br />Subsurface disturbance activities are expected to include trench excavations for utilities, <br />completion of the stormwater detention basin, general grading, and other construction and <br />earth moving activities associated with redevelopment of the Site. It is anticipated that any <br />excavation or trenching for redevelopment activities will not extend below the groundwater <br />table that was generally encountered between 12 and 16 feet bgs. Reuse of excavated <br />materials occurred on the adjacent parcel to the south (Parcel B) and is expected at the Site as <br />part of the redevelopment process. <br />1.6 Applicability of this SMP <br />This SMP describes protocols to be implemented if previously unknown waste pits (e.g. similar <br />to the North and South Waste Cells on Parcel B) or other areas of obvious soil impacts with <br />potentially hazardous materials (e.g. similar to that observed in excavation for utility trench as <br />documented in Attachment 3 Figure 16 to the Order (Appendix A) are encountered during <br />subsurface disturbance activities that may be conducted as part of ongoing and future Site <br />redevelopment. <br />As discussed in Section 1.3.1, soil remediation at the WU1 Sliver on the Site is being conducted <br />in accordance with the WU1 Plan Addendum, not this SMP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.