Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 2/21/2019 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault; 4) devices monitoring product piping: 5) devices monitoring fill piping, 6) devices monitoring vent piping, 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring ventltransition sumps; 9) devices monitoring under -dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />rAoniton„q srvEal cL.tn��a>bn <br />usrm..d.nng site plan <br />= x Aaa•ss: 1022 FRONTAGE ROAD RIPON GA <br />•PIPING• <br />.-ARROWS) - <br />Uao <br />_>c= a. 4 L Dc _ - <br />]:c mdagratni <br />arra_ i• <br />Ji1'lLa3. 1aE <br />o>�oc ,yaeu2at2 _ <br />*:LLL yllLti. 5TORE <br />f r <br />I <br />!F� <br />)C i2G III <br />1, <br />�r <br />.F_ <br />T l <br />a/ <br />F=FILLS <br />T=TLRBLNY P <br />P=PROBE - <br />\-=l--.POR <br />S=SLAP SENSOR <br />L =LD r <br />B =Brine Smaor � <br />i <br />I=Smart Sesaor <br />S =S?P <br />C-=Flwez&Chain: <br />E -E Stop <br />--------------------------- <br />pq''s-,2ae i>p,asw;: vrdar-:ir;'. (�•ir�: narcrnipr.ryass D•.r:ng <br />ro'a_ir <br />_ _ c -. _ ». c.--. •rrt-.. L._r: or:-., Os�w^1 Grt}ca•on ��{sur 'epla- <br />. - _n.'L= _ � I �ti `>. .1o'ro '_ J+'�r - t a'ely[x�r�ps vo'I•A c'�D�•. <br />LEGEND <br />