Laserfiche WebLink
GPH =Gabrs Per How, Y=Yes, N =No, NA= Not Appli able, VPH=VaaamResmze+WroeWdti , ID=1derEficafion <br />UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of s) <br />XII. LINE LEAK DETECTOR TESTING <br />L] Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this <br />section.) <br />This section must be completed H LLDs are Installed. <br />Y <br />N NA <br />Was a leak simulated to verify LLD performance?— <br />(Check all that apply.) Simulated leak rate verified: 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH O <br />EJ [:1Was <br />the testing apparatus properly calibrated? <br />O <br />❑ ❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ 0 <br />For mechanical LLDs, does the LLD restrict the Bow through the pipe when a leak is detected? <br />11 El <br />electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ XFor <br />electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnectetl? <br />❑ <br />❑ O <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ 0 <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />13 El <br />answer of "N" above, describe in Section XlIf how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM I PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br />Q Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak defection monitoring. <br />Ystem Type (Mark all that apply.) ❑ Vacuum Pressure <br />i ❑ ❑Hydrostatic <br />Sensor ID Component(S) Monitored By This Sensor Sensor Functionality <br />Interstitial Communication <br />Test <br />Test <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Paas <br />❑ Fail <br />❑ passE] Fail <br />❑ Paas <br />❑ Fail <br />❑ <br />How was interatrial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space Pass F-1 Fai❑ Pass <br />❑ Visual Inspection <br />❑ Fail <br />Other (Describe the method in section XV below. ❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes L -j No ribe the reason in hon XV below.) <br />"Fall' <br />For any answer of above, describe in Section XV how and when these issuers were orcwill be corrected, <br />XV. COMMENTS <br />GPH =Gabrs Per How, Y=Yes, N =No, NA= Not Appli able, VPH=VaaamResmze+WroeWdti , ID=1derEficafion <br />