My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085397_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
23751
>
2600 - Land Use Program
>
SR0085397_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2022 9:39:41 AM
Creation date
6/30/2022 1:17:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0085397
PE
2602
STREET_NUMBER
23751
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25010015
ENTERED_DATE
6/13/2022 12:00:00 AM
SITE_LOCATION
23751 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Values and Assumptions: <br /> I= 76,440 gals=total WW/yr= 10,219 cu ft =0.129 in/yr <br /> 21.83 Ac x 43,560 sq ft/Ac x(1 ft/12 in) <br /> Nw= 90 mg N/L <br /> d = Assume 45%due to the percentage of clay soil at the soil-effluent interface. <br /> R = 2.21 in/yr. <br /> Nb= Assumed to be 0.1 ppm NO3 N <br /> 0.129 in/yr(90 mg N/Q (1 -0.45)+(2.21 in/yr x 0.1 m 1Q <br /> Nr = (0.129 in/yr+2.2 1,in/yr) <br /> Nr =2.8 ppm as nitrate-nitrogen(NO3-N), 12.6 ppm as nitrate. <br /> Regarding nitrate loading calculations for the onsite modular home,the EHD has specified wastewater flow <br /> projections from single family residential(SFR)structures to be calculated as follows: 100 gpd for the first <br /> bedroom and 50 gpd for all subsequent bedrooms within the structure. <br /> I= 3 Bedrooms=200 gals/d x 365 =73,000 gals/yr=9,760 cu ft =0.123 in/yr <br /> 21.83 Ac x 43,560 sq ft/Ac x (I ft/12 in) <br /> Nw=45 mg N/L <br /> d = 45%denitrification factor based on the nitrate-nitrogen concentrations observed in the soil chemistry <br /> test results. <br /> R = 2.21 in/yr <br /> Nb= Assumed to be 0.1 ppm NO3 N <br /> (0.123 in/3r)(45 ma N/L)(1 -0.45)+(2.21 x 0.1 mg.1 <br /> Nr = (0.123 in/yr+2.21 in/yr) <br /> Nr = 1.4 ppm as nitrate-nitrogen(NO3 N); 6.2 ppm as nitrate(NO3). <br /> Therefore,the total nitrate contribution by the entire subject Parcel will be 2.8+ 1.4=4.2 ppm nitrate-nitrogen. <br /> IV. O.W.T.S;SYSTEM DESIGN: OPERATIONAL PARAMETERS AND COMPONENTS <br /> A. SEPTIC TANK <br /> Septic tanks store accumulated sludge, scum and effluent(clear zone)volumes,which in turn affect <br /> treatment of nitrogen within the tanks. Detention time calculations demonstrate that when the ADF is <br /> applied to the 2,000 gallon tank,there remains ample detention time. A 2,000 gallon tank is proposed <br /> instead of a 1,200 gallon tank in the event that Phase II is implemented,and to mitigate nitrate loading <br /> potential. <br /> I <br /> -7- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.