r7aDetentionme Calculation: <br /> i <br /> Detention Time=2,000 gal tank capacity x 0.70(30%volume lost to sludge/scum accumulation) <br /> 1.5 (Peaking Factor)x 245 gals/day(ADF) <br /> Detention Time=3.8 days. The minimum acceptable detention time is 1.0 day. <br /> B. FILTER BED SIZING CALCULATIONS <br /> The proposed effluent disposal area is heavily constrained by driveways, to the north, south and <br /> west. The disposal area is 19 ft wide. Incorporating five ft setbacks from the driveways results in <br /> a 9 ft wide filter bed disposal area. The length of this area is also constrained. Therefore,the <br /> disposal area can now be considered engineer designed. My design criteria is based on the SJC <br /> Onsite Wastewater Treatment Systems Standards, Section 9.7.3: "Dispersal field application rates <br /> for engineer designed systems may also be determined using Table 3 in Water Quality Control <br /> Policy for Siting, Design, Operation, and Maintenance of Onsite Wastewater Treatment Systems. <br /> The established perc rate for this project was determined to be 18 minutes per inch(mpi). This <br /> translates to an application rate of 0.686 gallons per square foot/day(gals/sf/d), found in Table 3. <br /> The filter bed area is 9 ft wide N-S and 50 ft long E-W=450 sf. The effluent acceptance rate= <br /> 450 sf x 0.686 gals/sf/d=309 gpd. The ADF was calculated to be 245 gpd. Therefore, the filter <br /> bed is adequate size by more than 26%. <br /> C. 100% REPLACEMENT/RESERVE AREA <br /> The 100%replacement area is designated directly west of the primary disposal area, as illustrated <br /> on the design plans. The replacement area is also to be a rectangular filter bed construction, with <br /> equal square footage as the primary filter bed area. <br /> D.. OPERATIONAL PARAMETERS AND COMPONENTS <br /> SSS§ 3.7. The design of the filter bed disposal system is based upon the factors for efficient <br /> operation, disposal field longevity, and environmental protection. An overview of the system <br /> operation to serve the proposed facility is as follows: <br /> Influent from the Restrooms will gravity flow into a P&L Concrete, Inc. standard precast, 2,000 <br /> gallon septic tank. A Polylok, Inc. PL-68 effluent filter is to be installed at the outlet of this tank. <br /> Clarified effluent will gravity to a three-hole Distribution box (D-box), where the effluent will be <br /> equally distributed between two, 47 ft long leachlines, spaced 3 ft apart and with capped ends. A <br /> minimum of 12" of washed drain rock is to be placed under the perforated pipe and extending 2" <br /> above the perforated pipe. Geotechnical fabric is to be placed over the drain rock and backfilled to <br /> final grade with the native, excavated soil. <br /> Pae -8- <br /> Chesney Consulting <br />