Laserfiche WebLink
1. On page 3 of the permit application you included a billing party that is different from what we have on file. <br /> Submit a written statement if the billing party needs to be changed and provide the correct billing party <br /> information. <br /> 2. Submit complete and current training certifications for one installer and one service technician. See the <br /> attached certification chart for reference. <br /> Please let me know if you have any questions. <br /> Thank you, <br /> Elianna Florido, Sr. REHS <br /> San Joaquin County Environmental Health Department <br /> Registered Environmental Health Specialist <br /> 1868 East Hazelton Ave <br /> Stockton, CA 95205 <br /> P: (209) 616-3050 1 F: (209) 468-3433 1 E: eflorido@sigov.org <br /> c:o I <br /> From:Werelius, Stig<Stig.Werelius@stantec.com> <br /> Sent: Monday, November 8, 20211:03 PM <br /> To: Florido, Elianna [EHD] <eflorido@sigov.org> <br /> Cc:Semling, Gary<Gary.Semling@stantec.com>; Rivera, Stacy [EHD] <srivera@sigov.org> <br /> Subject: RE: SR0083832 Safeway 19533 S. Mountain House Pkwy. <br /> Importance: High <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Hi Elianna, <br /> The revise FT-7 Drawing and other items requested are attached. I am hopeful that this final step can be expedited as we <br /> are very close to pulling permits and breaking ground on the project. <br /> Below is the response from the fueling engineer in regard to the monitoring diagram. <br /> The Veeder-Root Vacuum monitoring diagram is designed to show how the annular space of all double-walled lines <br /> will be monitored. The tank sumps, dispenser sumps, and remote vent sump are all brined filled and will be monitored <br /> by brine sensors. The sumps are mentioned in the diagram, and associated table, as the starting points and end <br /> points for each zone of the applicable vacuum line. None of primary lines, or chase pipes, will be vacuum monitored in <br /> this installation. <br /> Please do not hesitate to call me with any questions or comments. <br /> Respectfully, <br /> Stig Werelius <br /> Design Lead <br /> Direct: 707 774-8333 <br /> Direct: 707-765-1660 ext 751 <br /> Fax: 707 765-9908 <br /> Stig.Werelius@stantec.com <br /> 6 <br />