My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002397
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MICKE GROVE
>
11793
>
2600 - Land Use Program
>
UP-90-05
>
SU0002397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:17:52 PM
Creation date
7/7/2022 9:51:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002397
PE
2626
FACILITY_NAME
UP-90-05
STREET_NUMBER
11793
STREET_NAME
MICKE GROVE
STREET_TYPE
RD
City
LODI
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
11793 MICKE GROVE RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AL <br /> Lake Membrane Seal (SS-13 Chemical) <br /> Scope of Work <br /> LS-1 These specifications cover the work and equipment necessary for <br /> the installation of a treated and compacted soil lining in six inch <br /> layers. When accomplished, the work will result in a treated <br /> membrane sol lining with a smooth finished grade on the bottom. <br /> Whenever, in these specifications, the term soil or base material <br /> is used, the meaning and intent is referenced to the natural soils <br /> or mixtures from the construction site as designated on the plans, <br /> and may be taken either from the stockpiled or in-place material. <br /> Materials <br /> Id LS-2 Manufacturing: Manufacturer shall have been in business for at <br /> least 1 year and must produce evidence of having manufactured <br /> the Seepage Inhibitor ESS- 13, as well as the Soil Stabilizer E-13 <br /> for this period of time. <br /> LS-3 Soil Stabilizer: Soil stabilizer shall be an enzyme wetting agent <br /> and compaction aid, trade name Enzyme-13 as manufactured and <br /> distributed by Seepage Control, Inc., P.O. Box 10566, Scottsdale <br /> Arizona 85271 (602) 254-4501. <br /> LS-4 Seepage Inhibitor: Seepage inhibitor shall be a surfactant known <br /> by trade name ESS-13 as distributed and manufactured by Seepage <br /> Control, Inc., P.O. Box 10566, Scottsdale, Arizona 82571 (602) <br /> 254-4501. <br /> L5-5 Low Permeability Membrane: The low permeability membrane <br /> shall be constructed with select soils from the site, mixed, <br /> treated with soil stabilizer to form a low permeability membrane <br /> after compaction. Total thickness shall be 12 inches (As <br /> recommended by supplier of sealant materials). <br /> L5-6 Soil Or Base Material: The liner will consist of a treated and <br /> compacted soil. The soil to be treated will be from a source <br /> approved by the seepage inhibitor manufacturer. The source <br /> approval will be contingent upon test data indicating the <br /> permeability of the treated soils will be 1 x 10-7 c.p.s. or less <br /> when compacted to the minimum density specified herin. <br /> LS- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.