Laserfiche WebLink
or covered with a protective layer of soil. <br /> LS- 14 Filling: Upon initial filling of the containment, exposed <br /> membrane areas will be protected with concrete spillways and <br /> splash pads to prevent erosion. Alternate methods maybe used <br /> upon approval of the supplier or project engineer. <br /> LS-15 Flooding With Chemical: Should sealant material for flooding be <br /> deemed necessary by seepage inhibitor manufacturer, following <br /> compaction and application of the curing solution, the compacted <br /> membrane shall be flooded with water containing the <br /> recommended amount of seepage inhibitor per acre of wetted <br /> area. The larger areas may be divided into convenient sections <br /> for flooding by the use of dikes. Dikes can be removed, leveled or <br /> left in place prior to flooding the contiguous sections. <br /> Quantities of Sealant Materials <br /> Id LS-16 Quantities of sealant materials shall be as established by <br /> laboratory tests and approved by the engineer. <br /> 10 Control of Membrane Construction <br /> LS- 17 The construction of the seepage control membrane shall be under <br /> go the supervision and control for the manufacturer of the sealant <br /> materials. <br /> I� LS_ <br /> 18 The manufacturer of the sealant material shall have the right to <br /> stop all work pertaining to the membrane liner if their <br /> specifications are not being met. <br /> LS- 19 The owner shall provide contractual authority for the sealant <br /> suppliers rights and obligations under these specifications. <br /> LS-20 To assure proper application of materials, the suppliers may <br /> implement changes in construction methods upon approval of the <br /> project engineer. <br /> i <br /> LS- 4 <br />-I�, <br />