05110 Structural & Miscellaneous Metals <br /> 3.05 DEFECTIVE WORK AND MATERIALS <br /> A. Work found to be defective, missing or damaged shall be immediately replaced with <br /> proper Work. Such replaced Work and the inspection for same shall be at the expense of <br /> the Contractor. All proposals for the repair or replacement of damaged, defective, or <br /> missing Work to be reviewed by the Architect/Engineer. <br /> B. Straightening of any materials, if necessary shall be done by a process and in a manner <br /> that will not injure the materials. <br /> C. If defects or damage Work cannot be corrected in the field, the material shall be returned <br /> to the shop or new parts furnished. The Contractor shall replace all Work at his own <br /> expense. <br /> 3.06 CLEANING <br /> A. After erection, all surfaces shall be cleaned and left free of all grime and dirt. Remove <br /> unused materials, tools, equipment and debris from the premises and leave broom clean. <br /> End of Section <br /> Micke Grove Zoo Wash Water and Septic Disposal System 05110-6 <br /> Siegfried Engineering, Inc. <br /> MESA Project LOCA 0701 <br />