My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014644
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MIDWAY
>
0
>
2600 - Land Use Program
>
S-76-4
>
SU0014644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:16:34 PM
Creation date
7/7/2022 11:46:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014644
PE
2600
FACILITY_NAME
S-76-4
STREET_NUMBER
0
STREET_NAME
MIDWAY
STREET_TYPE
DR
City
TRACY
APN
23710032
ENTERED_DATE
12/13/2021 12:00:00 AM
SITE_LOCATION
MIDWAY DR
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roof valley flashing shall be provided of not less than No. <br /> 28 galvanized sheet gauge corrosion-resistant metal and shall <br /> extend at least eleven inches (11" ) from the center line each <br /> gray and shall have a splash diverter rib not less than one inch <br /> (1" ) nigh at the flow line formed as part of the flashing: Sec- <br /> tions of flashing shall have an end lap of not less than four <br /> inches <br /> Weather exeosures s n1l not exceed those set forth' in the <br /> Uniform Building; Code. Hip and ridge weather exjosu res shall <br /> not exceed those :)ermit,'ed for the field of the roof. <br /> H. PAINTING <br /> "111 paint shall be applied in strict ac--:ordance with the <br /> XI <br /> manufacturers specifications . Applicable specifications are to <br /> be considered as though written in full in these specifications . <br /> 1 . All paint shall be delivered to the job site in original <br /> containers , with la.b.e1. intact and seals unbroken. <br /> 2. Paint shall be applied evenly so as to be free of runs , <br /> streaks or defects .. All surfaces shall be thoroughly sanded <br /> and cleaned before commencing work and between each coat. <br /> All -nail holes , cracks , joints , and other small defects shall be <br /> well puttied , or spackled and sanded before starting. Noticeable <br /> defects which cannot be corrected by this Contractor shall be <br /> reported , for other correction, to the General Coutractor before <br /> paintinn work begins . Application of paint is acceptance of the <br /> conditions of the surface by the Painting Contractor, <br /> 30 Materials : <br /> All materials used are to be Fuller-O 'Brien Corporation's <br /> manufacture, or equal. <br /> No paint, varnish or stain shall be reduced or appied in <br /> any way except as herein specifically called for, or <br /> recommended by the manufacturer. <br /> a. Exterior Woodwork: <br /> 1-coat 220-23 xterior ,'rood Primer (n , work) <br /> 2-coats 260-xr, douse & Trim Paint <br /> b. Exterior ',,rood: (Siding) <br /> 2-co-- ts Olympic heavy-bodied stain. <br /> c. Exterior Metal : <br /> 1-coat 221-14 Zinc Dust - Zinc Oxide Primer (new work) <br /> 2-coats 260-xx Nouse and Trim Paint. <br /> (51 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.