My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 6:03:07 PM
Creation date
7/18/2022 8:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
UNFI GROCERS DISTRIBUTION, INC (STOCKTON)
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by LJ Manufacturer ® Industry Standard L-1 Professional Engineer <br />Test Type Ll Pressure 0 Vacuum L) Hydrostatic <br />Test Equipment Used: gauge <br />Tank ID <br />die <br />Tank Manufacturer <br />Unknown <br />Tank Capacity <br />10000 <br />Test Start Time <br />10:47 <br />Initial Reading <br />10hg <br />Test End Time <br />11:47 <br />Final Reading <br />10hg <br />Change in Reading <br />0 <br />PassfFail Criteria <br />10 <br />Tightness Test Results <br />10 Pass L-1 Fail J Pass J Fail J Pass J Fail L-1 Pass Fail <br />17. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by L1 Manufacturer ® Industry Standard L-1 Professional Engineer <br />Test Tvoe ® Pressure L1 Vacuum L1 Hvdrostatic <br />Test Eau iument Used: gauge I <br />Pipe Run ID <br />die high <br />die <br />Pipe Manufacturer <br />Test Start Time <br />ameron <br />9:43 <br />ameron <br />9:43 <br />Initial Reading <br />5psi <br />5psi <br />Test End Time <br />10:43 <br />10:43 <br />Final Reading <br />5psi <br />5psi <br />Change in Reading <br />0 <br />0 <br />PassfFail Criteria <br />0 <br />0 <br />Tightness Test Results <br />® Pass El Fail <br />0 Pass J Fail J Pass Ll Fail 0 Pass Q Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />r <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />PassfFail Criteria <br />Tightness Test Results <br />Ll Pass L Fail <br />Ll Pass Ll Fail Q Pass I_' Fail LJ Pass Ll Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness rest must be described in <br />the COMMENTS section. <br />Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.