Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMPIUDC TEST <br />Test Method Developed by LJ Manufacturer Z111 Industry Standard LJ Professional Engineer <br />Test Type Ll Pressure U Vacuum 61 Hydrostatic <br />Test Equipment Used: lake test <br />SumplUDC ID <br />die high flow stp <br />die stp <br />ude 1 <br />Sump Manufacturer <br />unknown <br />unknown <br />unknown <br />Sump Depth (inches) <br />46 <br />46 <br />24 <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />20 <br />21 <br />a <br />Test Start Time <br />9:51 <br />9:51 <br />9:51 <br />Initial Reading <br />26in <br />26in <br />12in <br />Test End Time <br />10:51 <br />10:51 <br />10:51 <br />Final Reading <br />26in <br />26in <br />12in <br />Change in Reading <br />0 <br />0 <br />0 <br />PassfFail Criteria <br />.125 <br />.125 <br />.125 <br />Tightness Test Results <br />A Pass Ll Fail <br />0 Pass J Fail <br />E Pass Ll Fail <br />Ll Pass U Fail <br />SumplUDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />PassfFail Criteria <br />Tightness Test Results <br />0 Pass Q Fail <br />Ll Pass Ll Fail <br />Ll Pass Ll Fail <br />Ll Pass LJ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness rest must be described in <br />the COMMENTS section. <br />Page 3of5 <br />