Laserfiche WebLink
F. Voluntary Emission Reduction Agreement (VERA) <br /> Is this project part of larger project for which there is a VERA with the District?®No ❑ Yes,VERA#: <br /> G. Optional Section <br /> Do you want to receive information about the Healthy Air Living Business Partners Program?❑No ®Yes <br /> ParcelH. . Land Owner <br /> APN(000-000-00 Format) Gross Acres Land Owner <br /> 1. 051-310-50 2.03 Hwy 88 Self Storage, LLC <br /> 2. <br /> 3. <br /> Additional sheets for listing APN nurnbers can be found on the District's website at www.valle air.or ASR. <br /> 1. Project Development and Operation <br /> ❑ <br /> Will the project require demolition of existing structures? Yes,complete J <br /> ® No,complete K <br /> ■ • . <br /> Total square feet of building(s)footprint to be demolished: Number of Building Stories: <br /> Demolition Start Date(MonthfYear): Number of Days for Demolition: <br /> Expected number of work days per week during c structio0Z 5 days Z 6 days El 7 days <br /> For Trans ortationtYransit projects,please cdrlaplete L-1 <br /> For Residential/Non-Residential/Mixed-Use projects, ❑ No,complete L-2 <br /> will it be developed in multiple phases? Yes,eom fete L-3 <br /> Transporation I Transit Development and Timing Details <br /> Please note that development timelines provided within this section should reflect actual work time, and should not account for <br /> possible project delays. <br /> Start of Construction(Month/Year)-. End of Construction(MontbNear): <br /> Number of actual construction days: <br /> Length of road being constructed: miles Width of road being constructed; feet <br /> Predominant Soil Type choose one). Sand Gravel 0 Weathered Rock—Earth El Blasted Rock <br /> Amount of soil imported: cubic yards Amount of soil exported: cubic yards <br /> Amount of asphalt imported: cubic yards Amount of asphalt exported: cubic yards <br /> Total area to be disturbed: acres Maximum area disturbed per day: acres <br /> Average truck capacity: cubic yards Will water trucks be used? ❑Yes ❑No <br /> L-2. Single Phase Development <br /> Start of Construction(Month/Year); Gross Acres: <br /> End of Construction (MonthlYear): Net Acres(area devoted to buildings/structures): <br /> First Date of Occupation(Month[Year): Paved Parking Area(#of Spaces): <br /> Building Square Footage: Number of Dwelling Units: <br /> L-3. Phased Development and Building Construction <br /> . <br /> In addition to the information below ou can submit phases ecific activity timeline found on District's website at www.valleyair_orgJlSR, <br /> Start of Construction(Month/Year): 12!2023 Gross Acres:2.03 <br /> End of Construction(Month/Year): 512024 Net Acres(area devoted to buildingslstructures): .55ac <br /> First Date of Occupation(MonthlYear):512024 Paved Parking Area(#of Spaces):6 <br /> Building Square Footage:24,300sf Number of Dwelling Units:0 <br /> Start of Construction(Month/Year):412426 Gross Acres: 2.03 <br /> 2 End of Construction(Month/Year): 1212026 Net Acres(area devoted to buildingsr'structures): .76ac <br /> First Date of Occupation(MonthfYear): 1212626 Paved Parking Area(#of Spaces):0 <br /> Building Square Footage:33,400sf Number of Dwelling Units:0 <br /> Central Region Office: 1994 E.Gettysburg Ave.Fresno,GA 93726.0244 TEL(559)230-6000 www,vallevair.arallSR <br /> Page 2 of 13 Revised August 30,2022 <br />