Laserfiche WebLink
Start of Construction (Month/Year): Grass Acres: <br /> 3 End of Construction(Month/Year): Net Acres(area devoted to buildings/structures): <br /> First Date of Occupation(MonthlYear): Paved Parking Area(#of Spaces): <br /> Building Square Footage: Number of Dwelling Units: <br /> Start of Construction(Month/Year): Cross Acres: <br /> 4 End of Construction(Month/Year): Net Acres(area devoted to buildings/structures): <br /> First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces): <br /> Building Square Footage: Number of Dwelling Units, <br /> Additional sheets for phasing information can be found on the District's website at www_valleyainor-g ISR. <br /> M. •n-Site Emission Reduction ■ , • <br /> Listed below are categories of possible mitigation measures for applicants to implementthat will reduce a project's impact on air <br /> quality. Check"Yes"next to any measure that will be utilized for this project,and please complete the corresponding page in this <br /> form to identify specifics related to that measure. If a category is not applicable to the project,check"No"and provide justification <br /> for not selecting the measure. Also,the applicant is encouraged to provide any mitigation measures including supporting <br /> documentation that are not listed on this application form for District consideration. For reference,see www.valleyair.orgllSR for <br /> potential additional mitt iation measures. <br /> Clean Construction Fleet Mitgution Measure below can be selected for all development types <br /> 1.Clean Construction Fleet(Note:Making a commitment to using less polluting construction equipment) <br /> ❑ Yes,please complete mitigation measure 1 below <br /> ® No,please provide just fcation why not selected: Current fleet a ui menr will he the most zr dated as p2ssible as developer is <br /> committed to limit LILlulants <br /> Operational Mitgation Measure below can be selected for all development types,except for transportation and transit projects <br /> 2.Clean On-Road Trucks(e,g.Heavy Duty Trucks,Medium Duty Trucks,and Light Duty Trucks) <br /> Note- Operational fleet will use zero and/or near-zero emissions for all or part of its activities, <br /> ❑ Yes,please complete applicable mitigation measure 2a through 2c below <br /> ® No,please provide justification why not selecledLimited Frock requirement for this development. <br /> 3.On-Site Zero Emission Off-Road Vehicles and Equipment(e.g.electric forklifts and electric yard trucks) <br /> ❑ Yes,please complete applicable mitigation measure 3 below <br /> ® No,please provide justification why not selected.Not relevant for this development.. <br /> 4.Solar Panels(e.g.incorporate solar panels in the project) <br /> ❑ Yes,please complete applicable mitigation measure 4 below <br /> ® No,please provide justification why not selected:Not financiaily feasible for this ax ansion develo ment. <br /> 5, Electric Vehicle(EV)Chargers(e.g. incorporate onsite EV charging infrastructure) <br /> ❑ Yes,please complete applicable mitigation measaore 5 below <br /> ® No,please provide just fcation why not salected:Not fiPancially feasible or relevant for this ex ansion development, <br /> 6.Clean Lawn and harden Equipment(e.g.eletric mowers,electric leaf blowers,electric trimmers,etc.) <br /> ❑ Yes,please complete applicable mitigation measure 6 below <br /> ® No,please provide just f cation why not selected:Not relevant for this development, <br /> 7, Land Use/Location (e.g, increased density,improve walkability design,increase transit,etc.) <br /> ® Yes,please complete applicable mitigation measures 7a through 7f below <br /> ❑ No,please provide justifzcadan why not selected Development is 6.7 miles from Q&a Lodi. <br /> S. Neighborhood/Site Enhancements(e.g_improve pedestrial network,traffic calming measures,NEV network,etc.) <br /> Z yes,please complete applicable mitigation measures Sa through Sc below <br /> ❑ No,please provide just f cation why not selected.,Develo ment is within a rural area.. <br /> 9. Parking Policy/Pricing(e.g.parking cost,on-street market pricing,limit parking supply,etc.) <br /> ® Yes, please complete applicable mitigation measure 9a through 9e below <br /> ❑ No,please provide justification why not selected:Qyeraiions is wlilling to review incentive with Manager <br /> 14, Commute Trip Reduction Programs(e.g.workplace parking charge,employee vanpoolfshuttle,ride sharing program,etc.) <br /> ❑ Yes,please complete applicable mitigation measures 14a through 1 O below <br /> ® No,please provide justification why not selected:Not relevant for this develo meat. <br /> 11. Hearth(e.g.woodstoves or fireplaces) <br /> ❑ Yes,please complete mitigation measure 11 belov, <br /> ® No,please provide justification why not selected:Not relevant for this develQ ment. <br /> 12, Exceed Title 24(e.g.exceed Caiifornia Title 24 required energy efficiency for building(s)associated with the project) <br /> ❑ Yes,please complete applicable mitigation measures 12 below <br /> Central Region Office: 1990 E.Gettysburg Ave.Fresno,CA 93726-0244 TEL(559)230-6000 wwrm.valleyair.orgPSR <br /> Page 3 of 13 Revised August 30,2022 <br />