Start of Construction (Month/Year): Grass Acres:
<br /> 3 End of Construction(Month/Year): Net Acres(area devoted to buildings/structures):
<br /> First Date of Occupation(MonthlYear): Paved Parking Area(#of Spaces):
<br /> Building Square Footage: Number of Dwelling Units:
<br /> Start of Construction(Month/Year): Cross Acres:
<br /> 4 End of Construction(Month/Year): Net Acres(area devoted to buildings/structures):
<br /> First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces):
<br /> Building Square Footage: Number of Dwelling Units,
<br /> Additional sheets for phasing information can be found on the District's website at www_valleyainor-g ISR.
<br /> M. •n-Site Emission Reduction ■ , •
<br /> Listed below are categories of possible mitigation measures for applicants to implementthat will reduce a project's impact on air
<br /> quality. Check"Yes"next to any measure that will be utilized for this project,and please complete the corresponding page in this
<br /> form to identify specifics related to that measure. If a category is not applicable to the project,check"No"and provide justification
<br /> for not selecting the measure. Also,the applicant is encouraged to provide any mitigation measures including supporting
<br /> documentation that are not listed on this application form for District consideration. For reference,see www.valleyair.orgllSR for
<br /> potential additional mitt iation measures.
<br /> Clean Construction Fleet Mitgution Measure below can be selected for all development types
<br /> 1.Clean Construction Fleet(Note:Making a commitment to using less polluting construction equipment)
<br /> ❑ Yes,please complete mitigation measure 1 below
<br /> ® No,please provide just fcation why not selected: Current fleet a ui menr will he the most zr dated as p2ssible as developer is
<br /> committed to limit LILlulants
<br /> Operational Mitgation Measure below can be selected for all development types,except for transportation and transit projects
<br /> 2.Clean On-Road Trucks(e,g.Heavy Duty Trucks,Medium Duty Trucks,and Light Duty Trucks)
<br /> Note- Operational fleet will use zero and/or near-zero emissions for all or part of its activities,
<br /> ❑ Yes,please complete applicable mitigation measure 2a through 2c below
<br /> ® No,please provide justification why not selecledLimited Frock requirement for this development.
<br /> 3.On-Site Zero Emission Off-Road Vehicles and Equipment(e.g.electric forklifts and electric yard trucks)
<br /> ❑ Yes,please complete applicable mitigation measure 3 below
<br /> ® No,please provide justification why not selected.Not relevant for this development..
<br /> 4.Solar Panels(e.g.incorporate solar panels in the project)
<br /> ❑ Yes,please complete applicable mitigation measure 4 below
<br /> ® No,please provide justification why not selected:Not financiaily feasible for this ax ansion develo ment.
<br /> 5, Electric Vehicle(EV)Chargers(e.g. incorporate onsite EV charging infrastructure)
<br /> ❑ Yes,please complete applicable mitigation measaore 5 below
<br /> ® No,please provide just fcation why not salected:Not fiPancially feasible or relevant for this ex ansion development,
<br /> 6.Clean Lawn and harden Equipment(e.g.eletric mowers,electric leaf blowers,electric trimmers,etc.)
<br /> ❑ Yes,please complete applicable mitigation measure 6 below
<br /> ® No,please provide just f cation why not selected:Not relevant for this development,
<br /> 7, Land Use/Location (e.g, increased density,improve walkability design,increase transit,etc.)
<br /> ® Yes,please complete applicable mitigation measures 7a through 7f below
<br /> ❑ No,please provide justifzcadan why not selected Development is 6.7 miles from Q&a Lodi.
<br /> S. Neighborhood/Site Enhancements(e.g_improve pedestrial network,traffic calming measures,NEV network,etc.)
<br /> Z yes,please complete applicable mitigation measures Sa through Sc below
<br /> ❑ No,please provide just f cation why not selected.,Develo ment is within a rural area..
<br /> 9. Parking Policy/Pricing(e.g.parking cost,on-street market pricing,limit parking supply,etc.)
<br /> ® Yes, please complete applicable mitigation measure 9a through 9e below
<br /> ❑ No,please provide justification why not selected:Qyeraiions is wlilling to review incentive with Manager
<br /> 14, Commute Trip Reduction Programs(e.g.workplace parking charge,employee vanpoolfshuttle,ride sharing program,etc.)
<br /> ❑ Yes,please complete applicable mitigation measures 14a through 1 O below
<br /> ® No,please provide justification why not selected:Not relevant for this develo meat.
<br /> 11. Hearth(e.g.woodstoves or fireplaces)
<br /> ❑ Yes,please complete mitigation measure 11 belov,
<br /> ® No,please provide justification why not selected:Not relevant for this develQ ment.
<br /> 12, Exceed Title 24(e.g.exceed Caiifornia Title 24 required energy efficiency for building(s)associated with the project)
<br /> ❑ Yes,please complete applicable mitigation measures 12 below