Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-2200134 <br /> DAVID M. BONADONNA/DILLON& MURPHY <br /> Site Approval Application No. PA-2200134 was approved by the Community Development Department <br /> on August 29, 2022. The effective date of approval is September 8, 2022. This approval will expire on <br /> March 9, 2024, which is 18 months from the effective date of approval, unless (1) all Conditions of <br /> Approval have been complied with, (2)all necessary building permits have been issued and remain in <br /> force, and(3) all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: [209]468-3121) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a 2,400-square-foot self-storage facility as depicted on the site <br /> plan dated June 14, 2022. (Use Type: Personal Storage) <br /> c. MITIGATION MONITORING AND REPORTING PROGRAM: The project shall comply with all <br /> required mitigations included in the MMRP dated August 2022 (attached). <br /> d. CAPITAL FACILITY FEE:This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1. All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with (asphalt concrete) (chip seal) or Portland cement concrete to provide a <br /> durable, dust free surface. Bumper guards shall be provided when necessary to protect <br /> adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> 2. A minimum of 2 parking spaces shall be provided. (Development Title Section 9-1015.3) <br /> f. ACCESS AND CIRCULATION: The following requirements apply and shall be shown on the Site <br /> Plan: <br /> 1. Access driveways shall have a width of no less than 25 feet for two-way aisles and 16 feet for one- <br /> way aisles, except that in no case shall driveways designated as fire department access be less <br /> than 20 feet wide. (Development Title Section 9-1015.5[f][1]) <br /> g. LIGHTING: Lighting shall be provided and comply with the following: <br /> 1. If the parking area is to be used at night, parking lot lighting shall be installed. (Development <br /> PA-2200134—Conditions of Approval 1 <br />