My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SITE INVESTIGATION 2003 FINAL RPT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HENRY
>
22865
>
4400 - Solid Waste Program
>
PR0536590
>
ARCHIVED REPORTS_SITE INVESTIGATION 2003 FINAL RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 2:53:59 PM
Creation date
8/19/2022 2:11:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SITE INVESTIGATION 2003 FINAL RPT
RECORD_ID
PR0536590
PE
4430
FACILITY_ID
FA0021006
FACILITY_NAME
SNYDER SANITARY GARBAGE DISPOSAL
STREET_NUMBER
22865
Direction
S
STREET_NAME
HENRY
STREET_TYPE
RD
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
22865 S HENRY RD
P_LOCATION
06
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
➢ Collect representative burned refuse and soil samples, (samples of solid municipal <br />waste will not be sampled for analytical testing, as this material consists of <br />heterogeneous materials such as metal debris, asphalt concrete, and typical <br />household refuse etc., not conducive to sampling), <br />➢ Evaluate and summarize data obtained, <br />➢ Provide appropriate preliminary recommendations regarding site remediation options <br />(as applicable or required). <br />1.4. Responsible Agency <br />The CIWMB staff will be responsible for preparing the site investigation work plan and <br />coordinating investigation objectives with the LEA and their environmental consultant, Ninyo & <br />Moore. CIWMB staff will prepare the site investigation report and provide a copy of the report to <br />the LEA for their review and comments. The CIWMB will also place both the site investigation <br />work plan and report in CIWMB files and update the Solid Waste Information System (SWIS) <br />database. <br />1.5. Project Organization <br />The CIWMB project manager is: <br />Mr. Glenn K. Young, P.E. <br />California Integrated Waste Management Board <br />1001 "1" Street <br />P.O. Box 4025 <br />Sacramento, CA 95812-4025 <br />Telephone: (916) 341-6696 <br />Fax: (916) 319-7528 <br />CIWMB staff will generally perform the following activities: <br />a) contact the RWQCB and San Joaquin LEA to obtain available data regarding the <br />Santa Fe Road Disposal Sites, <br />b) review previously prepared documents, site investigation reports, and other <br />available data to evaluate the types, and suspected locations of buried wastes, <br />and summarize the information in this work plan, <br />C) review historical aerial photographs to obtain information on the locations <br />(horizontal) extent of the buried wastes, <br />d) delineate the extent of the study area and provide information regarding property <br />boundaries, <br />e) arrange with the property owners and provide access to each property where <br />boring and trench excavating are proposed to be performed, as required, <br />f) obtain boring and trench permits, as necessary, <br />g) prepare this site investigation work plan, <br />h) coordinate and oversee the field investigation activities and all aspects of the <br />analytical testing program. CIWMB staff will obtain appropriate sample <br />containers, labels, chain -of -custody forms, and shipping containers from their <br />environmental laboratory services contractor, ExcelChem, Inc. They will <br />1-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.