My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085755_SSCRPT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESTES
>
350
>
2600 - Land Use Program
>
SR0085755_SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 2:03:30 PM
Creation date
9/13/2022 8:05:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SR0085755
PE
2603
STREET_NUMBER
350
Direction
N
STREET_NAME
ESTES
STREET_TYPE
WAY
City
MOUNTAIN HOUSE
Zip
95391
APN
25604001
ENTERED_DATE
9/7/2022 12:00:00 AM
SITE_LOCATION
350 N ESTES WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JEFFREY ADAMS, PHD, PE <br /> completion of environmental remediation activities, Jeff was able to secure a substantial federal <br /> corporate income tax rebate on behalf of the client through the EPA's Brownfields Tax Incentive <br /> program. The project consists of a residential subdivision re-use of a former quarry. <br /> Brookside - Guadalupe Mines Road—San Jose, CA <br /> Senior Engineer. Jeff performed a review of existing environmental documents by others, <br /> consultation with the client, and peer review document preparation. This 16-acre commercial <br /> property is planned for redevelopment into a roughly 95-lot single-family residential development. <br /> Site challenges include pre-existing environmental impacts, existing fills, creek bank <br /> stability/meander, and faulting. <br /> East Garrison Development - Operations and Maintenance Plan—Carmel, CA <br /> Project Engineer. Jeff prepared an Operations and Maintenance Plan (OMP) that included an <br /> assemblage of projected capital and maintenance costs from a range of consultants into working <br /> 50-year budgets for both a County Service District (CSD) and a homeowner's association (HOA). <br /> He worked to reach agreement with a number of project stakeholders, including the developer, <br /> other consultants, and local government agencies. In addition to assisting in the preparation of <br /> capital expenditure projections, Jeff developed the two operating and maintenance budgets, <br /> maintenance activity schedules and checklists, and the governing document for the two <br /> maintenance entities. The project consists of a redevelopment from a former military facility to a <br /> residential subdivision. <br /> Highlands Ranch, Unit 3 - Environmental T&O—Pittsburg, CA <br /> Project Engineer. Jeff managed the remediation of a former petroleum tank farm located in a <br /> rural/exurban setting. The extensive remediation program was in support of a conversion of <br /> industrial site usage into residential site usage. At this prototypical Brownfield site, Jeff personally <br /> oversaw all field operations involving a series of subcontractors, including an innovative ex-situ <br /> enhanced bioremediation program of impacted soils. Following excavation, Jeff worked closely <br /> with California Department of Toxic Substances Control (DTSC) personnel to determine the <br /> suitability of the intended site reuse. Jeff implemented an innovative statistical procedure in <br /> accordance with State and Federal Environmental Agency Best Practices to assure the site was <br /> safe for residential use. The project consists of a large-scale residential subdivision. <br /> Highway 4 Bypass - Lime Treatment Consultation—Brentwood, CA <br /> Project Manager. Jeff served as Project Manager. He provided consultation services that <br /> consisted of a variety of forensic analyses pertaining to the lime treatment of sub-base soils. Jeff <br /> worked closely with the project contractor as well as a diverse range of stakeholders to determine <br /> if lime treatment materials used in construction had met project specification. Following several <br /> protocols, including ASTM methods, Jeff demonstrated the absence of a statistical correlation <br /> that would confirm the use of substandard materials. Jeff's work was used to produce an opinion <br /> on behalf of the project team that the treated materials would be expected to adequately perform <br /> over the design life of the project, saving significant cost overruns. The project consists of a <br /> multi-lane highway constructed within a rapidly growing region of Eastern Contra Costa County. <br /> The project consists of a multi-lane highway constructed within a rapidly growing region of Eastern <br /> Contra Costa County. <br /> Lockheed Martin Storm Water Pond No 4—Sunnyvale, CA <br /> Project Manager. Jeff provided permitting consultation services, including the federal and state <br /> permitting required for the maintenance of a stormwater detention system. Jeff has also provided <br /> geotechnical and environmental support to evaluate the geotechnical conditions of the site. He <br /> also determined the absence of environmentally impacted materials within the site area. The site <br /> JArGEO <br /> Expect Excellence <br />
The URL can be used to link to this page
Your browser does not support the video tag.