Laserfiche WebLink
Lennar Homes of California Mountain House Creek, Parcel L, Tract 3424, Tracy <br /> 4943.410.103 Phase I Environmental Site Assessment <br /> sources for vapor intrusion within 1/10 mile of the Property or volatile organic compound (VOC) <br /> sources within 1/3 mile of the Property. <br /> 4.0 SITE RECONNAISSANCE <br /> 4.1 METHODOLOGY <br /> ENGEO conducted a reconnaissance of the Property on January 21, 2022. The reconnaissance <br /> was performed by Amar Jain, a Staff Engineer of ENGEO. The Property was viewed for <br /> hazardous materials storage, superficial staining or discoloration, debris, stressed vegetation, or <br /> other conditions that may be indicative of potential sources of soil or groundwater contamination. <br /> The Property was also checked for evidence of fill/ventilation pipes, ground subsidence, or other <br /> evidence of existing or preexisting underground storage tanks. Photographs taken during the site <br /> reconnaissance are presented in Figure 4. <br /> 4.2 EXTERIOR OBSERVATIONS <br /> The following table summarizes our observations during the reconnaissance. <br /> TABLE 4.2-1: Exterior Site Observations <br /> FEATURE TYPE OBSERVATIONS <br /> Structures No structures were observed during the site reconnaissance. <br /> Hazardous Substances and No hazardous substances or petroleum products were <br /> Petroleum Products in Connection <br /> with Identified Uses observed within the Property during the site reconnaissance. <br /> Storage Tanks (underground and No above-ground storage tanks or evidence of existing <br /> above-ground) underground storage tanks was observed during the site <br /> reconnaissance. <br /> Odors No odors indicative of hazardous materials or petroleum <br /> material impacts were noted at the time of the reconnaissance. <br /> Pools of Potentially Hazardous Liquid No pools of potentially hazardous liquid were observed within <br /> the Property at the time of our reconnaissance. <br /> Drums No drums were observed on the Property at the time of the <br /> reconnaissance. <br /> Polychlorinated Biphenyls (PCBs) No potential PCB-containing equipment, including <br /> Containing Equipment transformers, was observed within the Property during our site <br /> reconnaissance. <br /> Hazardous Substances and No hazardous substance or petroleum product containers were <br /> Petroleum Product Containers observed on the Property at the time of our reconnaissance. <br /> Pits, Ponds, and Lagoons A water drainage ditch was observed within the Property at the <br /> time of our reconnaissance. <br /> Stained Soil/Pavement No stained soil or pavement was observed within the Property <br /> at the time of our reconnaissance. <br /> Stressed Vegetation No signs of stressed vegetation were observed on the Property <br /> at the time of our reconnaissance. <br /> Solid Waste/Debris Concrete pipes and various construction debris were observed <br /> the southwestern portion of the Property. <br /> Stockpiles/Fill Material No stockpiles or fill material was observed on the Property <br /> during the reconnaissance. <br /> ENGEOPaqe I R January 28, 2022 <br /> Expect Excellence- <br />