Laserfiche WebLink
—� <br />—�" &Associates <br />MILANI <br />Task 4 - Final Report <br />Under Task 4, a final report documenting field work conducted, survey information collected, findings and <br />conclusions will be prepared. Records obtained from Task 1 will be incorporated into an appendix. The reduced <br />field survey data from Task 3 will also be presented in a tabular format in the final report. The final report will <br />also include a drawing showing the mapped limits of the septic tanks, leach field, water well and the property <br />boundary for Parcel A and Parcel B. Actual setback distances will be noted on the drawings. <br />The final report will include a photo log and photo index map that show the location and orientation of <br />photographs. In addition, the plans shall show that the disposal (leach) field area will be barricaded so it cannot <br />be driven over, parked on, or used as a storage area. <br />If you have comments or questions regarding this workplan, please do not hesitate to contact the undersigned <br />at 925-674-9082. <br />Sincerely, <br />Milani & Associates <br />Mark Milani, PE, CAC, QSD <br />PE 35120, Exp. 9/30/2023 <br />Attachments: <br />Figures <br />Appendix A <br />Appendix B <br />SAJobs\2020 Job 1476 to 1884\1541.4\Workplan\1541.4 Workplan.dom <br />2655 Stanwell Drive, Suite 105 <br />Concord, CA. 94520 <br />Ph: (925)674-9082 <br />M1 <br />