Laserfiche WebLink
Determine mounting location for panel. If distance <br />exceeds the length of either the float switch cables or <br />the pump power cables, splicing will be required_ For <br />outdoor or wet installation, we recommend the use of a <br />S JE -Rhombus," liquid -tight junction box with liquid -tight <br />connectors to mane required connections. You must <br />use conduit sealant to prevent moisture or gases <br />from entering the panel. <br />2. Mount control panel with mounting flanges furnished with <br />control panel. <br />3. Determine conduit entrance locations on control panel. <br />Check local codes and schematic for the number of <br />power circuits required. <br />6. Determine location for mounting junction box according <br />to local code requirements. Cho not mount the junction <br />box inside the sump or basin. <br />7. Mount junction box to proper support. <br />9. Run conduit to junction box. Drill proper size holes for <br />the type of conduit used. Attach liquid -tight connectors <br />to junction box. <br />9. Identifyand label each wire before pulling through conduit <br />into control panel and junction box. Pull pump power <br />cables and control switch cables through connectors into <br />junction box. Male wire splice connections at junction <br />box. <br />NOTE: Be sure the incoming power, voltage, amperage. 16. Firmly tighten and seal all fittings on junction box. <br />and phase meet the requirements of the pump motors Insure all cable connectors are liquid -tight and sealed. <br />being installed. If in doubt, see the pump identification <br />plate for electrical requirements. 11. If a junction box is not required, connect pump and <br />float wires to proper position on terminals. See schematic <br />4. Drill proper size holes for type of connectors being used. inside control panel for terminal layouts. <br />NOTE: If using conduit, be sure that it is of adequate size 12. Connect control/alarm and pump power conductors <br />to pull the pump and switch cables through. You must to proper position on terminals. See schematic inside <br />use conduit sealant to prevent moisture or gases control panel for terminal connections, <br />from entering the panel. <br />5. Attach cable connectors and/or conduit connectors to <br />control panel. <br />FOR INSTALLATION REQUIRING A SPLICE, <br />FOLLOW STEPS 6-10 <br />FOR INSTALLATION WITHOUT A SPLICE, <br />GO TO STEP 11. <br />NOTE: It is the recommendation of the factory to use separate <br />pump and control/alarm poker sources. <br />VERIFY CORRECT OPERATION OF CONTROL PANEL <br />AFTER INSTALLATION IS COMPLETE. <br />FIGURE °I <br />Three float duplex <br />(mounting clamp) <br />FIGURE 2 <br />Four float duplex <br />(mounting clamp) <br />