My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
11662
>
4200 – Liquid Waste Program
>
PR0420091
>
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 4:52:30 PM
Creation date
10/5/2022 4:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
O & M MANUAL - WEST LANE MOBILE HOME PARK
RECORD_ID
PR0420091
PE
4242
FACILITY_ID
FA0000277
FACILITY_NAME
IL VINETO
STREET_NUMBER
11662
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05925003
CURRENT_STATUS
02
SITE_LOCATION
11662 N HAM LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C, Surface Preparation and Coating <br />All vessel surfaces to be painted will be properly prepared in a workmanlike manner so as <br />to obtain a smooth, clean and dry surface. All rust, dust, and mill scale, as well as other <br />extraneous matter, will be removed from the interior surfaces by means of near white <br />sandblast SSPC-SP10. All external surfaces will be commercial sandblasted to <br />SSPC-SP6. All interior and exterior vessel surfaces will be painted with 8-10 mils total <br />dry film thickness (TDFT) of a black coal tar epoxy type coating. <br />D. Inlet Bar Screen <br />A bar screen will be provided at the influent port to remove any unusually large solids from <br />the incoming raw sewage. The bar screen will be fabricated from 1/2" diameter bars <br />spaced 1" apart and arranged as shown on the drawings. The bars shall be sloped to <br />permit easy cleaning of accumulating debris. A deck will be furnished for drying this <br />debris. The bar screen shall have the same protective coating as specified for the plant. <br />E. Flow Equalization Chamber <br />A flow equalization chamber will be supplied with a volume designed to handle 25% to <br />100% of the daily design flow. The flow equalization chamber allows for a constant flow <br />through the plant by equalizing flow surges that may be incurred during peak flow times. <br />Flow control will be accomplished by pumping the plant influent to a flow control box <br />containing an adjustable overflow broad weir and a v -notch discharge weir. The <br />overflow broad weir will be adjustable so that a measured amount of pumped influent will <br />discharge through the V -notch weir to the aeration chamber, while recycling the <br />remaining pumped influent back to the equalization chamber. <br />A duplex set of equalization pumps will be furnished and installed within the chamber. <br />The pumps will be rated 1/2 HP, 230 volt, 3 phase, and 60 cycle. An emergency <br />overflow will be provided between the equalization and aeration chamber. <br />A blower/motor unit mounted in a fiberglass housing will be supplied to meet the air <br />requirements of the equalization chamber. The blower unit will be capable of delivering <br />20 CFM when operating at 5 PSI. The motor will be 1 HP, ODP type for operating on 230 <br />volts, 1 phase, 60 cycle service. Liquid level sensors will regulate the pumps and <br />blower/motor unit. Controls will be provided in the plant control panel. <br />F. Sludge Holding Chamber <br />The chamber will be of the aerated type. The volume of the sludge holding chamber is <br />based on 3 cu. ft. per capita. Diffused air will be supplied by the plant blower system <br />supplying 30 CFM of air per 1000 cubic feet of volume. The diffusers will be located <br />parallel to and near the bottom of the tank. All piping and valves in the chamber will be <br />factory installed. A fixed supernatant decant pipe will be provided within this chamber. <br />P6018 west Lane MHP 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.