My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
11662
>
4200 – Liquid Waste Program
>
PR0420091
>
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 4:52:30 PM
Creation date
10/5/2022 4:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
O & M MANUAL - WEST LANE MOBILE HOME PARK
RECORD_ID
PR0420091
PE
4242
FACILITY_ID
FA0000277
FACILITY_NAME
IL VINETO
STREET_NUMBER
11662
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05925003
CURRENT_STATUS
02
SITE_LOCATION
11662 N HAM LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Aeration Chamber <br />The aeration chamber will be of sufficient capacity to provide a minimum of 24 hours <br />retention of the average daily flow, and/or maximum loading of 15 pounds of BODS per <br />1,000 cubic feet of aeration tank volume. To insure maximum retention, enhance spiral <br />rotation and eliminate short-circuiting of raw sewage, the aeration chamber will be <br />constructed with fillets top and bottom, air diffusers will be placed longitudinally along one <br />side of the chamber, and flow control baffles will be provided. To insure adequate <br />circulation velocity, the proportion of chamber width to depth, in the direction of rotation <br />will not exceed 1.33 to 1. The velocity of rotation will be sufficient to scour the chamber <br />bottom and prevent sludge filleting as well as to prevent the escape to the surface of <br />minuscule air diffusion bubbles, causing their entrapment to provide maximum <br />oxygenation efficiency. <br />H. Clarifier Chamber <br />The clarifier chamber will be sized to provide a minimum of 4 hours retention, based upon <br />the same design flow rates governing the aeration chamber, and will have proper baffling <br />to prevent short circuiting and to provide maximum uniform retention. <br />The total settling volume will include the volume of the upper one-third of the sludge <br />hopper. The bottom of the chamber will be formed into an inverted pyramidal hopper or <br />hoppers. The flat bottom area of the hopper will in no case be greater than one square <br />foot. The slope of the hopper walls will not be less than 1.7 vertical to 1.0 horizontal. <br />Settled sludge will be returned from the clarifier sludge hopper to the aeration chamber by <br />the positive sludge return system, consisting of one or more airlift pumps. The clarifier <br />effluent will pass over the edge of the baffled effluent weir into the effluent trough and then <br />out of the chamber. The effluent weir trough will be equipped with an adjustment to <br />permit precise leveling of the serrated weir after plant installation. <br />I. Sludge Recirculation System <br />There will be installed within the clarifier chamber a positive sludge recirculation system <br />consisting of airlift sludge return assembly. The airlift pump will have the recirculation <br />capacity ranging from 0% to 150% of the design flow. The airline supplying air to the <br />pump will be equipped with a cock valve to vary the amount of air supplied to each pump, <br />thus varying the capacity of the pump. The airlift pump will be firmly supported and <br />equipped with a clean-out plug to allow for easy cleaning and maintenance. <br />J. Scum Recirculation System <br />There will be installed within each clarifier chamber a positive scum and skimming <br />recirculation system consisting airlift skimming devices. The skimming device will be a <br />positive airlift pump type, located in a position to skim and return floating material to the <br />aeration chamber. The airline supplying air to the skimming device will be equipped with <br />P60 i 8 West Lane MHP 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.