Laserfiche WebLink
PROJECT NUMBER BORING NUMBER <br /> MW-23R SHEET 1 OF 1 <br /> - WELL COMPLETION LOG <br /> PROJECT P6 &E Stockton Phase IV, Stockton, CA LOCATION Stockton, CA <br /> ELEVATION 13.23 NGVD DRILLING CONTRACTOR Spectrum Exploration <br /> DRILLING METHOD AND EQUIPMENT Hollow Stem Auger - 10" <br /> MATER LEVELS 33.99 btoc START 3/29/98 FINISH 4/2/96 LOGGER T.Little/K.Sheets <br /> 0 GROUND SURFACE <br /> 2"Diameter-Conductor Casing <br /> rout <br /> 8"Borehole <br /> 10 <br /> 20 <br /> 30 <br /> 40 <br /> Portland Grout <br /> 50 "Schedule 40 PVC Well Casing <br /> w <br /> w <br /> 80 <br /> W <br /> D <br /> 70 <br /> 80 <br /> 90 <br /> entonite Slurry <br /> 100 <br /> MC Lonestar 2/12 Sand <br /> ch 40 4"Dia.020 Machine Slot PVC Screen <br /> 110 <br /> See Boring Log <br /> For Drilling Details <br />