Laserfiche WebLink
❑ <OTHER> ......... ......... ......... <br /> *Air-purifying respirator ** Maximum use concentration <br /> Geosyntec Procedures: HS-111-Air Monitoring,HS-602-Lead,HS-605-Hydrogen Sulfide,Wildfire Smoke THA Addendum <br /> E.2. OTHER WORKER EXPOSURE MONITORING ❑ Applicable ® Not Applicable, Not Anticipated <br /> ®Heat/Cold Stress Testing/Monitoring ❑Wildfire Smoke—Tracking AQI(Air Quality Index) ❑<Other> <br /> ❑Air Sampling(sample collection,passive dosimeter) ❑Ionizing or Non-ionizing Radiation Testing ❑<Other> <br /> ❑Wipe/Bulk Sampling(to evaluate worker exposure) ❑Noise Testing <br /> Site-Specific Notes,Clarifications: <br /> Geosyntec Procedures: HS-109-Hearing Protection,HS-111-Air Monitoring,HS-124-Heat Stress Prevention,HS-125-Cold Stress Prevention, <br /> HS-126-Radiation Safety Program,HS-128-Ionizing and Non-ionizing Radiation,HS-601-Asbestos, <br /> HS-602-Lead,HS-604-Respirable Crystalline Silica,HS-605-Hydrogen Sulfide <br /> E.3. FENCELINE 1 PERIMETER AIR MONITORING ❑ Applicable ® Not Applicable, Not Anticipated <br /> Fence line/perimeter air monitoring to be conducted in accordance with a separate"Perimeter Air Monitoring Plan"for this work;results from fence line/perimeter air <br /> monitoring shall NOT be used as the sole basis for determining work zone atmospheric hazards. <br /> Site-Specific Notes,Clarifications: <br /> PART F-APPROVALS, ACKNOWLEDGEMENTS <br /> F.1.THA PREPARATION, REVIEW/APPROVAL SIGNATURES A THA is typically prepared by project staff,often with input from an HSC,with <br /> review/approval,at a minimum,by PM or PD.Corporate H&S staff must be consulted as required or otherwise deemed appropriate*. <br /> Printed Name Signature Date <br /> THA PREPARED BY: Ron Gestler 06/25/2022 <br /> THA Printed Name Signature Date <br /> REVIEWED/ Dean Zapishny 7-20-2022 <br /> APPROVED BY: <br /> (Project Manager or <br /> Project Director,at a <br /> minimum) <br /> *At a minimum,Corp.H&S must review/approve the THA review when Geosyntec staff will encounter"high hazards/high risks,"or perform critical tasks,such as(but not limited to): <br /> Climb ladders to heights>10' Implement lockout/tagout controls Instrument monitoring for critical exposure risks <br /> Use a personal fall apparatus Enter a trench/excavation>5'deep Wear a respirator <br /> Self-perform tasks classified as construction labor Work near heavy equipment or crane Presence of"high-risk"contaminant(s) <br /> Climb ladders to heights>10' Function as a construction"Competent Person' Sustained exposure to wildfire smoke AQIPM 2.5>150 <br /> Tow a trailer on roadway Operate a pneumatic or powder-actuated tool Enter EZ/CRZ during HAZWOPER cleanup activities <br /> Oversee a hot-work permit system Electrical testing&maintenance(<50 V excluded) Exposure to radioactive isotopes(a,R,y) <br /> Enter a permit-required confined space Work at height near overhead electrical utility lines Onsite risk of emergency chemical spill <br /> Operate a UTV/ATV,aerial lift or fork-lift Derive action levels for VOCs or toxic dusts Applicability of Chemical Anti-Terrorism Standards <br /> Corporate H&S must also be consulted when Geosyntec subcontractors(under Geosyntec's oversight)perform high hazard/high risk work(such as demolition,blasting,crane lifts, <br /> confined space entry,testing/maintenance of electrical systems,lockout/tagout,HAZWOPER cleanup activities),OR when supplemental written H&S programs are required for a project <br /> (such as Electrical Safety Program,Lockout Program,Confined Space Entry Program,Emergency Response Plan),OR when a written safety plan must be submitted to a public agency. <br /> Consultation with Corp.H&S is encouraged for all questions/concerns regarding worker safety,regulatory compliance,risk/liability aspects,or project-specific safety requirements. <br /> Geosyntec H&S Procedure:For more information,see HS-204-Work-Specific Hazard and Risk Assessment,Written Safety Plans. <br /> F.2. GEOSYNTEC FIELD CREW ACKNOWLEDGEMENTS <br /> Please sign below to acknowledge you reviewed and understand this THA,participated in project safety briefing and had an opportunity to ask questions about the information herein. <br /> Printed Name Signature Employee No. Date <br /> Geosyntec° Project/Task Name:TR0712/GSH OxyChem-Stockton SVP Installation <br /> THA Date:06/25/2022 Page 15 <br /> consultants <br />