PART C- TASK/HAZARD/CONTROL SUMMARY and EQUIPMENT LIST
<br /> C.1 SUMMARY OF TASKS, HAZARDS AND CONTROLS
<br /> 1.TASKS/WORK ASPECTS 2. HAZARDS/RISKS 3. CONTROLS
<br /> • Use routine safe/defensive driving practices(seat belts,safe
<br /> speeds,eyes ahead,no tailgating,limit distractions,safe cell
<br /> phone use,no texting,clear windows,account for
<br /> weather/road conditions,adequate sleep,other measures as
<br /> Mobilization/Demobilization Routine work travel appropriate).
<br /> • Plan travel route before driving(assemble maps,enter
<br /> destination in GPS).
<br /> • Check 360 degrees around the vehicle.
<br /> • All workers have"Stop Work"authority
<br /> Oversight of subcontractors during . Slip/trip/fall hazards,vehicle traffic, • High visibility safety vests,hard hats,and steel-toe boots
<br /> utility locate warm weather/heat stress 0 Walk the site to evaluate work areas and designate routes of
<br /> travel and keep walkways clear of obstructions
<br /> Pay careful attention to work environment to identify hazards
<br /> (e.g.water,ice,debris)
<br /> • Wear steel toed shoes with adequate grip for environmental
<br /> conditions
<br /> • Use traffic cones or work vehicle to establish a safe work
<br /> zone.Make eye contact with drivers of vehicles travelling by
<br /> • Good housekeeping practices in work areas
<br /> • Be prepared for warm weather conditions,complete
<br /> Geosyntec's Heat Stress Tool prior to beginning work to
<br /> determine heat stress risk level
<br /> • Drink fluids through the day,wear sunscreen,take breaks as
<br /> needed and be aware of signs of overheating/heat illness
<br /> • All workers have"Stop Work"authority
<br /> Coring of Concrete Sidewalk and Slip/trip/fall hazard,wet surfaces, Good housekeeping
<br /> Installation of Dual-Nested Soil cement dust from drilling,flying . Use power cords/extension cords specified by instructions.
<br /> Vapor Probes Using Hand Auger debris/projectiles(concrete chips), Use ground-fault circuit interrupters(GFCls)in accordance
<br /> pinch-points,power/hand tools, with manufacturer's instructions. Inspect cording daily and do
<br /> electrical shock,subsurface not use if damaged. Ensure any extension cords are out of
<br /> utilities,warm weather/heat stress, the way of walkways and plugged in correctly to outlets
<br /> portable electric generator . Appropriate PPE(high-visibility vest,steel-toed boots with
<br /> operation,loud noise,flammable grip,gloves,eye and hearing protection)
<br /> liquids(gasoline), Conduct coring in well ventilated spaces where possible
<br /> ergonomics/awkward positions, Use wet methods for coring to minimize dust
<br /> potential inhalation exposure to . Hand auger the boring only in approved location,cleared of
<br /> VOCs underground utilities
<br /> • Set up pedestrian traffic control(e.g.,cones around work
<br /> area)
<br /> • Communication with site supervisors
<br /> • Avoid pinch-points
<br /> • Be aware of"line of fire"injury potential
<br /> • Perform air monitoring using PID to assess potential VOCs in
<br /> breathing zone
<br /> • Be prepared for warm weather conditions
<br /> • Drink fluids through the day,wear sunscreen,take breaks as
<br /> needed and be aware of signs of overheating/heat illness
<br /> • Keep fire extinguisher readily available when operating
<br /> portable generator and when refueling it
<br /> • Only refuel generator when it is off
<br /> • Use proper ergonomic positions when operating hand auger
<br /> or lifting equipment.Lift with legs and not with back,get help
<br /> for loads greater than 50 pounds or use equipment to lift
<br /> • Air monitoring as described in Part E1
<br /> • All workers have"Stop Work"authority
<br /> C.2. SAFETY EQUIPMENT LIST(Gear to be brought to the worksite by Geosyntec personnel,or availability confirmed)
<br /> Site-Specific Notes,Clarifications: Level D PPE will always be worn while performing project activities,including high-visibility clothing,steel-toed boots,safety
<br /> glasses,hard hat,and nitrile gloves OR general work gloves(leather,rubber coated fabric or similar)for all other times when workers are not in contact with potentially
<br /> contaminated materials or equipment. A first aid kit and drinking water will be kept in the on-site vehicle for use during completion of the fieldwork.Regular cooling
<br /> breaks will be taken if required.
<br /> Geosyntec° Project/Task Name:TR0712/GSH OxyChem-Stockton SVP Installation
<br /> THA Date:06/25/2022 Page 2
<br /> consultants
<br />
|