Laserfiche WebLink
• <br />• <br />Kleinfelder has tentatively scheduled the drilling to start on May 8, 1991. If you have any <br />questions or need additional information, please do not hesitate to contact us. <br />Sincerely, <br />KLEINFELDER, INC. <br />S '� <br />Christina J. K� edy� <br />Staff Geologist <br />Stephen S. Boll, P.E. <br />Senior Engineer <br />CJK:SSB:mg <br />cc: Carrie Cummings, Forward Inc. <br />Enclosure <br />F19-91-13 <br />Copyright 1991 Kleinfelder, Inc. <br />KLEINFELDER 9795 Business Park Drive, Sacramento, CA 95827 (916) 366-1701 <br />