Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-2200207 <br /> GOLDEN PRIME INVESTMENTS, LLC <br /> Administrative Usa Permit Application No.PA-2200201•was approved by the Community Development <br /> D¢partment on June 7,2024.The etf¢ctiv¢date of approval is June 17,2024.This approval will expire <br /> on June 17, 2027, which Is thirty-six (36) months from the affective data of approval, unless (l) all <br /> Conditions of Approval have been complied with,(2)a0 necessary building permits have be¢n issued <br /> and r¢main in force,and (8) all nec¢ssary permits from other agenci¢s have been issued and remain <br /> in foroe. <br /> Unless oth¢rwise specified, all Conditions of Approval and ordinanc¢ requir¢ments shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building parmlfs. Those Condl[ions <br /> followed by a SecOon Number have been identlflatl as ordinance r¢quir¢ments pertinent to this <br /> application. Ordinanc¢ requirements cannot be modified, and ocher ordinance requirements may <br /> apply_ <br /> t. COMMUNITY DEVELOPMENT DEPARTMENT(Contact:[209]468-3121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT".Tha Site Pian <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details Including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to tM1¢ "SITE PLAN <br /> CHECK LIST"for details). Foundation and soils Investigation shall be conducted in conformance with <br /> CM1apter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Sita Plan review. (Development Title Section 9-602.020) <br /> b. APPROVED USE:This approval is for a truck parking facility to be constructed in two phases within <br /> five years, as shown on TM1e site plan dated May t2, 2022. (Use Typa:Truck Services- Parking) <br /> • Phase One, with permits issued within 3 years, includes the parking for a maximum of 61 trucks <br /> and 66 trailers. <br /> • Phase Two,with permits Issued within 5 years, includes the construction of a 11,500 square toot <br /> building for private truck repair. <br /> c. MITIGATION MONITORING AND REPORTING PROGRAM: Tha project shall comply with all <br /> required mitigations included in tM1e MMRP dated February 2024. <br /> d. CAPITAL FACILITY FEE:This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-6t O.O�O) <br /> e. MERGER: A merger application to merge APN: t79-172-55 antl t79-172-54 must be filetl prior to <br /> issuance of any building permits.A fee is required witM1 this application. <br /> f. SURFACING:All permanent parking areas, including driveways and maneuvering ar¢as, shall ba <br /> surtaced and permanently maintained with asphalt concrete or Portland cement concrete. Bumper <br /> guards and/or wheel stops shall be provided when necessary to protect adjacent structures or <br /> properties. (Development Titl¢Section 9-406.060[i]) <br /> g. VEHICLE PARKING:Off-street parking shall be provided and comply with the following: <br /> 1. A minimum of t t permanent off-street veM1icle parking spaces shall be provided (1 space per <br /> 1,000 square feet). (Development Title Section 9-406.040). <br /> PA-2200207—Conditions of Approval t <br />