My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084501 (6)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
6220
>
2900 - Site Mitigation Program
>
SR0084501 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:05 PM
Creation date
10/18/2022 9:36:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084501
PE
2903
FACILITY_ID
FA0026861
FACILITY_NAME
PLASTAKET MANUFACTURING CO INC
STREET_NUMBER
6220
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
APN
04912002
ENTERED_DATE
11/18/2021 12:00:00 AM
SITE_LOCATION
6220 HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Limited Phase II Site Assessment Work Plan <br />PLASTAKET PROPERTY <br />6220 East Victor Road (Hwy 12), Lodi, California <br /> <br />TABLE OF CONTENTS <br /> <br /> <br />SECTION PAGE <br /> <br />1.0. INTRODUCTION ................................................................................................... 1 <br />2.0 SCOPE OF WORK................................................................................................ 1 <br />2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES ........................................ 2 <br />2.2. SOIL BORING AND SAMPLING ........................................................................ 2 <br />2.3. LABORATORY ANALYSIS ................................................................................ 2 <br />2.4. SOIL-VAPOR SAMPLING AND SAMPLING ...................................................... 2 <br />2.5. REPORT PREPARATION.................................................................................. 3 <br />3.0. FIELD PROCEDURES .......................................................................................... 3 <br />3.1. SOIL PROBE BORING ADVANCEMENT .......................................................... 3 <br />3.1.1. Soil Sampling ............................................................................................... 3 <br />3.1.2. Soil-Vapor Sampling & Analysis .................................................................. 4 <br />3.1.3. Boring Abandonment ................................................................................... 5 <br />3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT .......................... 5 <br /> <br /> <br />FIGURES <br /> <br />Figure 1 – Site Plan
The URL can be used to link to this page
Your browser does not support the video tag.