My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084501 (6)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
6220
>
2900 - Site Mitigation Program
>
SR0084501 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:05 PM
Creation date
10/18/2022 9:36:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084501
PE
2903
FACILITY_ID
FA0026861
FACILITY_NAME
PLASTAKET MANUFACTURING CO INC
STREET_NUMBER
6220
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
APN
04912002
ENTERED_DATE
11/18/2021 12:00:00 AM
SITE_LOCATION
6220 HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09 November 2021 <br />Project No. 21-6640 <br />Page 5 of 5 <br /> <br />The soil-vapor sample will be transported under chain-of-custody procedures to an ELAP- <br />certified laboratory and analyzed for VOCs and Helium (tracer gas) in accordance with <br />EPA Method TO-15. <br /> <br />After collection of the sample, soil-vapor from the polyethylene tubing will be monitored <br />for the presence of volatile organics using an organic vapor meter equipped with a photo- <br />ionization detector (PID). <br /> <br /> <br />3.1.3. Boring Abandonment <br /> <br />All soil borings will be permanently sealed to prevent vertical migration of potential <br />contaminants. Soil borings shall be abandoned by backfilling with cement grout from the <br />total depth to surface grade. Borings will be abandoned with grout utilizing tremie <br />procedures. The top three to six inches of the boring abandonments will be completed <br />flush to surface grade with concrete. The EHD will be notified for grout inspection at least <br />48 hours prior to conducting grouting procedures. <br /> <br /> <br />3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> <br />All sampling tools used for sample collection will be thoroughly rinsed with clean water <br />after being washed with a solution of Alconox. All probing rods will be cleaned prior to <br />advancement at each probe boring location. Any soil or water waste generated during <br />field activities will be containerized in properly labeled DOT-approved 55-gallon drums <br />and stored on-site in an area generally lacking public access. Disposal alternatives will <br />be evaluated based on results of soil and water analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.