Laserfiche WebLink
Geosynte& <br /> consultants <br /> The IDW, once characterized, will be removed from the Site by American Integrated Services, <br /> Inc., from Fairfield, California, a California-certified waste hauler, and disposed of at an <br /> appropriate facility in accordance with state and federal regulations. <br /> If LNAPL is encountered, then disposal options for IDW will be assessed based on analytical <br /> data. <br /> The disposable sampling materials and personal protective equipment used in sample collection <br /> and processing (e.g., disposable gloves and paper towels)will be placed in heavy-duty garbage <br /> bags for disposal as solid waste. <br /> 3.3 Quality Assurance/Quality Control Procedures <br /> The purpose of this section is to provide confidence in the analytical results through a system of <br /> QA/QC performance checks with respect to sample collection methods, laboratory analyses, data <br /> reporting, and corrective action procedures to achieve compliance with established performance <br /> and data quality criteria. This investigation will follow the QA/QC procedures from Section 3.3 <br /> of the Final UST Work Plan to ensure that the data derived from this investigation meet program <br /> QA parameters and are defensible and usable for their intended purpose. The following QA/QC <br /> procedures will be implemented in accordance with the Final UST Work Plan: <br /> • Field quality assurance. <br /> • Special training requirements/certifications. <br /> • Laboratory quality controls procedures. <br /> • Data validation, verification, and management. <br /> 3.4 Data Reporting <br /> After completion of work, the data will be presented to the Port and the CVRWQCB in an <br /> investigation report, which will include the following items: <br /> • A description of field events. <br /> • Any deviations from sampling, analysis, and validation described in this Final Work <br /> Plan Addendum. <br /> • Field logs, including boring logs and COC forms. <br /> • Chemical testing results. <br /> • Data quality assessment. <br /> • Laboratory reports. <br /> • Data validation reports. <br /> Results will also be submitted electronically to the State Water Resources Control Board's <br /> GeoTracker database. <br /> Final Investigation Work Plan Addendum—UST 817B 9 June 24,2022 <br />