Laserfiche WebLink
Geospte& <br /> consultants <br /> 4. SCHEDULE <br /> This Final Work Plan Addendum will be implemented in accordance with the schedule below, <br /> following the receipt and acknowledgement of this Revised Draft Work Plan Addendum by the <br /> CVRWQCB: <br /> • June 2022—Incorporate CVRWQCB Revised Draft Work Plan Addendum comments <br /> and submit Final Work Plan Addendum. <br /> • July 2022—Conduct fieldwork. <br /> • September 2022—Submit a report to CVRWQCB that summarizes and evaluates the <br /> analytical data and proposes additional investigation, as necessary. <br /> The project schedule may be adjusted in consultation with the CVRWQCB based on potential <br /> delays due to property access, permitting, or subcontractor availability. <br /> Based on the results of this investigation, the conceptual understanding of the distribution of <br /> petroleum hydrocarbons in soil, soil vapor, and, if present, groundwater will be updated. Next <br /> steps for further investigation or remedial action, as necessary, will be discussed with the <br /> CVRWQCB prior to the finalization of the report of findings. <br /> Final Investigation Work Plan Addendum—UST 817B 10 June 24,2022 <br />