Laserfiche WebLink
Geosyntec° <br /> consultants <br /> 5. REFERENCES <br /> Geosyntec Consultants, Inc. (Geosyntec). 2018. Groundwater Monitoring Work Plan, Rough and <br /> Ready Island, Port of Stockton, Stockton, California. 1 June. <br /> Geosyntec. 2019a.Final UST Data Gap Investigation Work Plan— UST Sites 605, 517, 916B, <br /> 817B, Rough and Ready Island Port of Stockton, San Joaquin County, California. 22 <br /> January. <br /> Geosyntec. 2019b. Draft Soil and Soil Vapor Investigation— UST 817B, Port of Stockton, Rough <br /> and Ready Island. 30 August. <br /> Geosyntec. 2020. Groundwater Monitoring Work Plan 2nd Addendum, 2020 Plan. 24 April. <br /> Geosyntec. 2021. 2021 Annual Groundwater Monitoring Report, Rough and Ready Island, Port <br /> of Stockton, Stockton, California. 17 December. <br /> PRC Environmental Management, Inc. 1993. Underground Storage Tank UST 817B-2, Tank <br /> Removal Summary Report, Naval Communication Station, Stockton, California. 17 May. <br /> San Francisco Bay Regional Water Quality Control Board. 2019.Environmental Screening <br /> Levels. 24 January. <br /> Smith Technology Corporation. 1996. UST Closure Report, Port of Stockton, Rough and Ready <br /> Island, UST 8178, Stockton, California. October. <br /> State Water Resources Control Board. 2012. Low-Threat Underground Storage Tank Case <br /> Closure Policy. 17 August. <br /> Tetra Tech Environmental Management, Inc. 2001.Final Building 817-B Underground Storage <br /> Tank Site Investigation Report, Naval Computer and Telecommunication Station San Diego <br /> Detachment Stockton, Stockton, California. 14 August. <br /> Final Investigation Work Plan Addendum—UST 817B 11 June 24,2022 <br />