My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084976
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARFARGOA
>
4522
>
2900 - Site Mitigation Program
>
SR0084976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 10:16:35 AM
Creation date
10/19/2022 10:14:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084976
PE
2903
FACILITY_ID
FA0027047
FACILITY_NAME
PROPOSED DISTRIBUTION CENTER
STREET_NUMBER
4522
Direction
E
STREET_NAME
MARFARGOA
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17922013
ENTERED_DATE
3/9/2022 12:00:00 AM
SITE_LOCATION
4522 E MARFARGOA DR
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety and Health Plan <br />Proposed Distribution Center Stockton, California <br />February 18, 2022 Terracon Project No. NA227001 <br />17 <br />Laminated Tyvek Coveralls <br />Tape Sleeves/Legs to Gloves and Boots <br />If air monitoring exceeds Action Level specified for upgrade to LEVEL C personal protective <br />equipment, personnel will don: <br />Full Face Air Purifying Respirator <br />Equipped with Combination Organic Vapor/Acid Gas/HEPA Cartridges <br />Respirator cartridges will be changed daily prior to start of site activity. <br />14.0 DECONTAMINATION <br />Equipment decontamination is required on all sites with petroleum hydrocarbon impact. <br />Personnel decontamination for projects below personal protective Level C will consist of washing <br />off safety footwear, proper cleaning or disposal of outer and inner gloves and thorough washing <br />of face, arms and hands. For projects involving Level C personal protective equipment, a <br />decontamination station will be established and the following procedures enforced. <br />14.1 Personal Decontamination <br />Personnel will establish a decontamination station on the interface of the Exclusion Zone. A <br />Contaminant Reduction Zone will be established and will extend 10 feet beyond from the <br />decontamination station. <br />Two Wash Tubs <br />Scrub Brush <br />Plastic Bags <br />Water and Alconox Detergent <br />The wash tub on the exclusion zone side of the site will contain a solution of water and Alconox <br />detergent; the second wash tub will contain clean rinse water. Personnel decontamination will <br />consist primarily of detergent washing and rinsing of reusable exterior protective gear. Coveralls <br />will be removed by turning the clothing inside out. <br />Personnel may not leave the contaminant reduction zone without proceeding through the <br />decontamination sequence described below. The general decontamination sequence should be <br />as follows: <br />Wash work gloves, boots and polylaminated protective coveralls, <br />Rinse work gloves, boots and coveralls, <br />Remove tape at wrists and ankles,
The URL can be used to link to this page
Your browser does not support the video tag.