My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084976
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARFARGOA
>
4522
>
2900 - Site Mitigation Program
>
SR0084976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 10:16:35 AM
Creation date
10/19/2022 10:14:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084976
PE
2903
FACILITY_ID
FA0027047
FACILITY_NAME
PROPOSED DISTRIBUTION CENTER
STREET_NUMBER
4522
Direction
E
STREET_NAME
MARFARGOA
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17922013
ENTERED_DATE
3/9/2022 12:00:00 AM
SITE_LOCATION
4522 E MARFARGOA DR
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety and Health Plan <br />Proposed Distribution Center Stockton, California <br />February 18, 2022 Terracon Project No. NA227001 <br />18 <br />Remove protective coveralls, <br />Remove respirator <br />Dispose of spent cartridges; wash and rinse respirator <br />Remove outer gloves <br />Remove inner gloves <br />Expendable personal protective equipment will be placed in plastic trash bags, sealed and <br />disposed of per client agreement. Decontamination solutions will be containerized or disposed of <br />as arranged by Project Manager. <br />14.2 Equipment Decontamination <br />Decontamination of equipment will be performed to limit the migration of contaminants off-site. All <br />equipment will be cleaned prior to site entry to remove grease, oil and encrusted soil. <br />Decontamination of large equipment will consist of physically removing gross contamination with <br />shovels, brushes etc. followed by detergent and water high pressure wash with a clean water <br />rinse. The Project Manager is responsible for determining if decontamination solutions must be <br />containerized. If so, a decontamination sump or polyethylene sheeting and fluid containers will be <br />mobilized and established in the decontamination area. Decontamination of hand samplers and <br />similar small equipment will be performed at a designated location within the Contaminant <br />Reduction Zone. Decontamination of such equipment will consist of detergent solution wash and <br />clean water rinse. <br />14.3 Power Washer/Decontamination Safety <br />The operator should wear safety glasses or a face shield at all times during use of the power <br />washer. Caution should be used while operating the washer to ensure that all Site personnel <br />are out of the area. <br />15.0 SITE COMMUNICATIONS <br />Communication between personnel within the Exclusion Zone will be via verbal communication <br />or hand signals. Visual contact between members of task teams should be possible throughout <br />the course of project activities. Contact with the SSO will be through direct verbal communication. <br />The following hand signals will be used by personnel wherever respiratory protection and/or <br />equipment noise limit verbal communication. <br />Signal Meaning <br />Thumbs Up OK; all is well <br />Grab throat with both hands Can't breathe <br />Shake head, thumbs down NO, negative
The URL can be used to link to this page
Your browser does not support the video tag.