i • <br /> Comment 5: Cover Material Page 6-7; the JTD lacks a plot plan, in accordance with <br /> Title 27 CCR Section 21600(6)(a), indicated the location of stockpiles of <br /> daily cover or ADC. <br /> Response: Section 6.4.4 - Daily Cover, has been revised to discuss the placement of <br /> three cover soil stockpiles throughout the life of the facility. <br /> Comment 6: Cover Material Page 6-7; indicates that the green waste will be stockpiled <br /> for two weeks prior to processing for ADC. The RFP Permit 39-AA-0020 <br /> has a condition that all green waste be processed within 72 hours of <br /> receiving it. <br /> Response: Section 6.4.6, Alternative Daily Covers, has been revised to indicate that <br /> the green waste will be processed within 72 hours. <br /> Comment 7: Volume Reduction Activities Page 6-15 indicates that green waste will be <br /> taken to the RRF for processing and that the green waste will be <br /> processed with a Diamond Z grinder. If the green waste arrives at the <br /> RRF for processing it must be counted against the daily tonnage of that <br /> permit even if used for ADC at the Forward Landfill. <br /> Response: This is understood. The JTD indicates that no volume reduction activities <br /> are currently performed. The green waste processing operation is only <br /> discussed as part of the composting operations and not as a volume <br /> reduction activity. <br /> Comment 8: Gas Management Plan Page 7-12; indicates that the new multi-depth <br /> perimeter probes will be installed if required. Title 27 CCR Section 20925 <br /> requires that the perimeter wells be placed at the maximum depth of the <br /> waste with one shallow and one intermediate and one deep probe. The <br /> multi-depth probes will be required. <br /> Response: Section 7.5.2, Perimeter Gas Monitoring, has been revised to indicate that <br /> should any existing probes (slated to remain in place as part of the <br /> expansion) become damaged they will be replaced with probes placed at <br /> the maximum depth of refuse. In addition any probes found to be short <br /> will be fitted with an additional probe at the refuse depth. <br /> Comment 9: Traffic Control Page 7-17; the JTD describes the traffic patterns to the <br /> facility and the available entrances used by the facility. The traffic flow on <br /> the facility was not discussed and any safety issues that might need to be <br /> addressed to insure the safe traffic flow into around and out of the facility <br /> as required by Title 27 CCR Section 21600(8)(f). <br /> (L:\Allied\2000.193\Corres2002\Agency Res:05/23/02) 2 <br />