Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. -26- <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS H LANDFILL <br /> SAN JOAQUIN COUNTY <br /> monitoring instrumentation, copies of all reports required by this Order,and records of all <br /> data used to complete the application for this Order. Records shall be maintained <br /> throughout the life of the facility including the postclosure period. <br /> Such legible records shall show the following for each sample: <br /> a. Sample identification and the monitoring point or background monitoring point from <br /> which it was taken, along with the identity of the individual who obtained the sample; <br /> b. Date, time, and manner of sampling; <br /> c. Date and time that analyses were started and completed, and the name of the <br /> personnel and laboratory performing each analysis; <br /> d. Complete procedure used, including method of preserving the sample, and the identity <br /> and volumes of reagents used; <br /> e. Calculation of results; and <br /> f. Results of analyses, and the MDL and PQL for each analysis. <br /> 3. A transmittal letter explaining the essential points shall accompany each report. At a <br /> minimum, the transmittal letter shall identify any violations found since the last report <br /> was submitted, and if the violations were corrected. If no violations have occurred since <br /> the last submittal, this shall be stated in the transmittal letter. The transmittal letter shall <br /> also state that a discussion of any violations found since the last report was submitted, <br /> and a description of the actions taken or planned for correcting those violations, including <br /> any references to previously submitted time schedules, is contained in the accompanying <br /> report. <br /> 4. Each monitoring report shall include a compliance evaluation summary. The summary <br /> shall contain at least: <br /> a. For each monitoring point and background monitoring point addressed by the report, <br /> a description of: <br /> 1) The time of water level measurement; <br /> 2) The type of pump - or other device - used for purging and the elevation of the <br /> pump intake relative to the elevation of the screened interval; <br /> 3) The method of purging (the pumping rate; the equipment and methods used to <br /> monitor field pH, temperature, and conductivity during purging; the calibration of <br />