Laserfiche WebLink
Geosyntec <br /> consultants <br /> LIST OF TABLES <br /> Table 1: Description of RRI Groundwater Sites (Section 1.2) <br /> Table 2: Hydraulic Conductivity Ranges at RRI (Section 2.3.4.1) <br /> Table 3: Groundwater Monitoring Plan <br /> Table 4: Proposed Well Construction Details <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Site Overview <br /> Figure 3: Island-wide Groundwater Plume Distribution <br /> Figure 4: Site 3 Cis-1,2-DCE and Vinyl Chloride Mann-Kendall Trends and Concentration <br /> in Groundwater <br /> Figure 5: Site 4 Cis-1,2-DCE and Vinyl Chloride Mann-Kendall Trends and Concentration <br /> in Groundwater <br /> Figure 6: Central Area Cis-1,2-DCE and Vinyl Chloride Mann-Kendall Trends and <br /> Concentration in Groundwater <br /> Figure 7: Northern Landfill Cis-1,2-DCE and Vinyl Chloride Mann-Kendall Trends and <br /> Concentration in Groundwater <br /> Figure 8: Southern Landfill Cis-1,2-DCE and Vinyl Chloride Mann-Kendall Trends and <br /> Concentration in Groundwater <br /> Figure 9: Sacramento-San Joaquin Delta Map <br /> Figure 10: USGS Sacramento-San Joaquin Delta Islands Conceptual Site Model <br /> Figure 11: RRI Hydrogeologic Conceptual Site Model <br /> Figure 12: USGS San Joaquin River Stream Gage Surface Water Elevations <br /> Figure 13: Drainage Channel System Map <br /> Figure 14: Schematic Cross Section Site 3 <br /> Figure 15: Schematic Cross Section Site 3 <br /> Figure 16: Schematic Cross Section Central Area <br /> Figure 17: Schematic Cross Section North Landfill Area <br /> Figure 18: Schematic Cross Section Central Landfill Area <br /> Figure 19: Schematic Cross Section South Landfill Area <br /> Figure 20: Sitewide 2020 Potentiometric Contours <br /> RRI Groundwater Monitoring Work Plan iii June 2022 <br />