My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085595 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
0
>
2900 - Site Mitigation Program
>
SR0085595 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:33:20 PM
Creation date
10/26/2022 1:22:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085595
PE
2903
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
0
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
ENTERED_DATE
7/28/2022 12:00:00 AM
SITE_LOCATION
0 W FYFFE ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> Figure 21: Hydrographs of Deep Monitoring Wells Around RRI Perimeter Compared to <br /> Surface Water Elevations <br /> Figure 22: Site 3 Groundwater and Surface Water Drainage Channel Geochemistry <br /> Figure 23: Landfill Groundwater and Surface Water Drainage Channel Geochemistry <br /> Figure 24: Site 3 Sampling Locations <br /> Figure 25: Site 4 Sampling Locations <br /> Figure 26: Central Area Sampling Locations <br /> Figure 27: Northern Landfill Sampling Locations <br /> Figure 28: Southern Landfill Sampling Locations <br /> LIST OF APPENDICES <br /> Appendix A: Response to Comments <br /> Appendix B: Historical Data Tables <br /> Appendix C: VOC Concentrations Over Time <br /> Appendix D: 2021 Hydrographs and Head Difference Graphs for Monitoring Well Clusters <br /> Appendix E: Standard Operating Procedures for Monitoring Well Installations <br /> Appendix F: Standard Operating Procedures for Low-Flow Groundwater Sampling <br /> Appendix G: Health and Safety Plan <br /> Appendix H: Quality Assurance Project Plan <br /> RRI Groundwater Monitoring Work Plan iv June 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.