Laserfiche WebLink
Geosyntec <br /> consultants <br /> Figure 21: Hydrographs of Deep Monitoring Wells Around RRI Perimeter Compared to <br /> Surface Water Elevations <br /> Figure 22: Site 3 Groundwater and Surface Water Drainage Channel Geochemistry <br /> Figure 23: Landfill Groundwater and Surface Water Drainage Channel Geochemistry <br /> Figure 24: Site 3 Sampling Locations <br /> Figure 25: Site 4 Sampling Locations <br /> Figure 26: Central Area Sampling Locations <br /> Figure 27: Northern Landfill Sampling Locations <br /> Figure 28: Southern Landfill Sampling Locations <br /> LIST OF APPENDICES <br /> Appendix A: Response to Comments <br /> Appendix B: Historical Data Tables <br /> Appendix C: VOC Concentrations Over Time <br /> Appendix D: 2021 Hydrographs and Head Difference Graphs for Monitoring Well Clusters <br /> Appendix E: Standard Operating Procedures for Monitoring Well Installations <br /> Appendix F: Standard Operating Procedures for Low-Flow Groundwater Sampling <br /> Appendix G: Health and Safety Plan <br /> Appendix H: Quality Assurance Project Plan <br /> RRI Groundwater Monitoring Work Plan iv June 2022 <br />