My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085504
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
SR0085504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 2:45:32 PM
Creation date
10/27/2022 2:17:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085504
PE
2903
FACILITY_ID
FA0025329
FACILITY_NAME
SAN JOAQUIN COUNTY HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
NEAR 14912010
ENTERED_DATE
7/8/2022 12:00:00 AM
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weston Solutions, Inc. <br /> Remedial Action Work Plan for the San Joaquin County Human Services Agency Site—Stockton, California <br /> NATURE AND EXTENT OF RESIDUAL CONTAMINATION <br /> collected from wells MW-2, MW-2A, and MW-7 during the last monitoring event(December <br /> 2020) were 12,000 µg/L, 0.9J µg/L, and 1.7 µg/L,respectively. <br /> Three water-bearing zones were identified while drilling the boring BH-14 with a deeper zone <br /> encountered at 110 feet and nearly 30 feet of clay between the deeper zone and intermediate <br /> zone above. Well MW-2 is the shallowest well and is constructed with 15 feet of well screen <br /> installed between 30 and 45 feet bgs; however, gravel,possibly from construction activities in <br /> the late 1980s, filled the bottom 7 feet of the well. Wells MW2A, MW3A, MW-6, and MW-7 <br /> have 20 feet of screen installed between various depths ranging from 35 to 63 feet bgs. The <br /> boring for MW-10 was drilled to a total depth of 110 feet bgs with at least 5 feet of clay at the <br /> bottom of the boring. The deeper groundwater is separated from the intermediate zone by at <br /> least 5 feet of clay at well MW-10, which is screened from 94 to 104 feet bgs. The benzene <br /> concentration in the groundwater sample collected from well MW-10 during the most recent <br /> monitoring event(December 2020) was 0.6 J gg/L. <br /> 4-3 February 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.