My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
19533
>
1600 - Food Program
>
PR0547980
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 12:53:22 PM
Creation date
11/1/2022 2:14:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547980
PE
1617
FACILITY_ID
FA0027360
FACILITY_NAME
SAFEWAY FUEL #5816
STREET_NUMBER
19533
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
01
SITE_LOCATION
19533 S MOUNTAIN HOUSE PKWY
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RL-2DRIM-05-E4-R IM-05-E4-RGLD36A-135GLD36A-135GLD36A-135GLD36A-135 <br />R10 <br />15'-6"R <br />SC1 <br />SC7 <br />SC6 <br />SC4 <br />SC7 <br />SC5 <br />SC9 <br />SC8 <br />A1 <br />R <br />R <br />R10 <br />A6 <br />SC2 <br />SC10 <br />R <br />34'-9" <br />A6 <br />SC3 <br />R01 <br />SC11 <br />S = 7/8" <br />SR = 3/4" <br />L = 1/2" <br />R10 <br />CU3CU4 <br />CU4 <br />BEER COOLER <br />BEVERAGE <br />COOLER <br />A2 <br />A3 <br />A4 <br />A5 <br />R10 <br />R10 <br />S = 7/8" <br />SR = 3/4" <br />L = 1/2" <br />S = 7/8" <br />SR = 3/4" <br />L = 1/2" <br />S = 7/8" <br />SR = 5/8" <br />L = 1/2" <br />S = 5/8" <br />SR = 1/2" <br />L = 1/2" <br />S = 7/8" <br />SR = 3/4" <br />L = 1/2" <br />R07 <br />R07 <br />R25 <br />L <br />L <br />L <br />L <br />L <br />L <br />R26 R26 <br />R26 <br />R26 <br />R26 <br />R26 <br />CU1CU1CU1CU1CU1CU11 1/4" = 1'-0" <br />REFRIGERATION PIPING PLAN <br />SYMBOLS <br />KEYED NOTES <br />GENERAL NOTES <br />SYMBOL KEYED <br />NOTE DESCRIPTION <br />CASE ELECTRICAL ENTRY <br />ELECTRICAL STUB-UP <br />CASE REFRIGERATION CONNECTION <br />REFRIGERATION STUB-UP <br />CASE CONDENSATE HUB DRAIN RE: R5-4 <br />COIL CONDENSATE TRENCH DRAIN <br />WALK-IN BOX COIL DRAIN LINE RE: R5-4, R6-6 <br />CONDENSATE DRAIN LINE DIRECTIONAL ARROW <br />SYSTEM REFERENCE NUMBER <br />REFRIGERATION CONDUIT RE: R5-2 <br />6" OR 8" SCHEDULE 40 PVC. <br />LIQUID LINE SOLENOID <br />REVISION SYMBOL <br />DEFROST TERMINATION <br />SUCTION LINE <br />LIQUID LINE <br />SUCTION RISER <br />ELECTRICAL REQUIREMENTS RE: R4 <br />THERMOSTAT <br />R10 <br />R00 <br />R08 <br />S <br />L <br />SR <br />L <br />DT <br />E <br />E <br />R <br />R <br />PIPING RISER <br />1. ALL STUB-UP DIMENSIONS ARE FROM OUTSIDE FACE OF EXTERIOR WALL OR <br />CENTER OF COLUMN UNLESS OTHERWISE NOTED. REFRIGERATION <br />CONTRACTOR TO VERIFY COLUMN LOCATION WITH R-1 SHEET. <br />2. ALL OVERHEAD REFRIGERATION LINES SHALL BE INSTALLED WHERE SHOWN <br />ON PLANS. <br />3. REFRIGERATION LINES SHALL BE INSTALLED ABOVE BOTTOM OF ROOF <br />STRUCTURE. AVOID CONFLICTS WITH SKYLIGHTS AND OTHER TRADES. <br />COORDINATE INSTALLATION & LOCATION WITH GENERAL CONTRACTOR. <br />4. ALL CASES SHALL HAVE MANUFACTURERS RECOMMENDED AIR GAP. <br />5. RE: R3 SCHEDULE FOR SYSTEM & CASE INFORMATION. <br />6. RE: R2 FOR REFRIGERATION PIPING REQUIREMENTS. <br />7.REFRIGERATION CONTRACTOR TO FILL ALL OPENINGS THROUGH WALK-IN <br />PANELS WITH FOAM INSULATION AFTER LINES ARE INSTALLED, INCLUDING <br />REFRIGERANT PIPING, CONDENSATE DRAINS, CONDUIT, SPRINKLER LINES. <br />R02 <br />EQUIVALENT LENGTHEL <br />R00 THERMOSTAT MOUNTED IN CASE BY CASE MANUFACTURER OR IN COOLER <br />BOX BY REFRIGERATION CONTRACTOR. RE: R-4.1. <br />R01 DEFROST AND TEMPERATURE CONTROL ACCOMPLISHED THROUGH LIQUID LINE <br />SOLENOID AT CONDENSING UNIT. <br />R02 COOLER DRAIN PIPING RE: R1, R5-6 <br />R03 COOLER DRAIN PIPING TO TERMINATE AT EXTENDED TRENCH DRAIN. TRENCH <br />DRAIN TO BE EXTENDED 12" TOWARD PIPING. <br />R05 REFRIGERATION LINES FROM TOP OF COOLER BOX RUNNING UP TO THE ROOF, <br />THEN OVERHEAD TO CONDENSING UNIT ON ROOFTOP. <br />R07 REFRIGERATION LINES FROM CASE CONNECTION TO WALL OR COLUMN, THEN UP <br />IN WALL OR COLUMN TO OVERHEAD, THEN OVERHEAD TO CONDENSING UNIT. <br />R08 DEFROST TERMINATION KLIXON INSTALLED BY CASE MANUFACTURER. <br />R10 LIQUID LINE SOLENOIDS AND ISOLATION VALVES SUPPLIED BY CONDENSING UNIT <br />MANUFACTURER AND INSTALLED BY REFRIGERATION CONTRACTOR AT OR IN <br />WALK IN COOLERS. SOLENOID POWER WIRES SHALL BE PROVIDED FROM LIQUID <br />LINE SOLENOID VALVE TO REFRIGERATION CONDENSING UNIT SYSTEM BY <br />ELECTRICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT <br />AND TERMINATE WIRE AT CONTROL MODULE AND SOLENOID. REFRIGERATION <br />CONTRACTOR TO PROVE PERFORMANCE OF THE VALVES AND REFRIGERATION <br />SYSTEM. RE: R-2 <br />R12 REACH IN DOOR LIGHT AND ANTI-SWEAT POWER PROVIDED BY GENERAL <br />CONTRACTOR. <br />R19 COORDINATE LOCATION OF ENVIRONMENTAL CONTROL PANEL WITH ENERGY <br />MANAGEMENT CONTRACTOR AND/OR AXIOM ENERGY SOLUTION. ELECTRICAL <br />CONTRACTOR TO PROVIDE POWER AND COORDINATE WITH ENERGY <br />MANAGEMENT CONTRACTOR. REFRIGERATION CONTRACTOR TO MOUNT <br />REFRIGERATION CONTROL ENCLOSURE AS CLOSE TO ECP AS POSSIBLE. <br />R20 KRACK MODEL ASHR9512ZFA ROOF MOUNTED CONDENSING UNIT <br />PROVIDED BY OWNER RECEIVED, SET AND INSTALLED BY REFRIGERATION <br />CONTRACTOR. LOCATION OF THE CONDENSING UNIT IS FOR REFERENCE <br />ONLY EXACT LOCATION TO BE VERIFIED WITH AOR. RE: R6-10 <br />R22 KRACK MODEL ASHR2460ZFA ROOF MOUNTED CONDENSING UNIT <br />PROVIDED BY OWNER RECEIVED, SET AND INSTALLED BY REFRIGERATION <br />CONTRACTOR. LOCATION OF THE CONDENSING UNIT IS FOR REFERENCE <br />ONLY EXACT LOCATION TO BE VERIFIED WITH AOR. RE: R6-10 <br />R23 ROOF PENETRATION AND PIPE HOOD BY GENERAL CONTRACTOR. RE: R5-3 <br />R24 FRONT OF CONDENSING UNIT. <br />R25 UNDERGROUND REFRIGERATION LINES TO BE PLACED IN PVC. RE:R5-2 <br />R26 FOR CONTINUATION OF PIPING TO CONDENSING UNIT ON ROOF RE: R3-1 <br />ELECTRICAL CONTRACTOR SHALL: <br />1. USE MATERIAL AND METHODS OF INSTALLATION THAT CONFORM TO ALL <br />APPLICABLE CODES AND ORDINANCES. <br />2. ELECTRICAL CONTRACTOR TO RUN ALL POWER AND CONDUIT AS INDICATED <br />IN THESE DRAWINGS AND ASSOCIATED SPECIFICATIONS. <br />PLUMBING NOTES <br />PLUMBING CONTRACTOR SHALL: <br />1.USE MATERIAL AND METHODS OF INSTALLATION THAT CONFORM TO ALL <br />APPLICABLE CODES AND ORDINANCES. <br />2.FURNISH AND INSTALL ALL FLOOR DRAINS, GREASE TRAPS (AS REQUIRED), <br />FAUCETS, HOT AND COLD WATER SUPPLY LINES, SHUT OFF VALVES, HOSE BIBS, <br />AND RECESSED METAL ENCLOSURES. <br />REFRIGERATION CONTRACTOR SHALL: <br />1.FURNISH AND INSTALL ALL CONDENSATE DRAIN LINES WITH APPROVED TRAPS <br />FROM EACH CASE OR EVAPORATOR COIL TO DRAIN, UNLESS OTHERWISE <br />SPECIFIED. <br />ELECTRICAL NOTES REGISTEREDP R O F E S SION <br />A <br />L <br />E <br />NGI <br />NEERJAR E D H .MIL <br />L <br />E <br />RST <br />A <br />TEOF C A L I F O R N IAM <br />ECHA N I C A LProject:21STAN01Phone: 208.288.2181 <br />SHEET TITLE <br />SHEET NO. <br />SUBMITTAL <br />CAD SAVED NAME: <br />PROJECT NO. <br />DRAWN BY: <br />CHECKED BY: <br />OWNER: 21.03.19 <br />BUILDING DEPT: 21.05.14 <br />O.T.B.: <br />DATES <br />REVISIONS: <br />DATE#REVISION BY <br />SAFEWAY FUEL CENTER #005519533 S. MOUNTAIN HOUSE PKWY.MOUNTAIN HOUSE, CA 953812007730004 <br />--www.stantec.comTEL. 1383 North McDowell Blvd. Suite 250Petaluma, CA 94954707.765.1660Architecture Inc.- <br />05 / 17 / 2021 <br />R2 <br />REFRIGERATION <br />PIPING PLAN
The URL can be used to link to this page
Your browser does not support the video tag.