Laserfiche WebLink
A.EXACT LOCATION OF PLUMBING FIXTURES SHALL BE <br />DETERMINED FROM ARCHITECTURAL DRAWINGS. <br />B.BEFORE SUBMITTING BID, THE PLUMBING CONTRACTOR <br />SHALL REVIEW THE ARCHITECTURAL DRAWINGS AND <br />INCLUDE IN HIS BID AN AMOUNT TO FURNISH AND INSTALL <br />ANY FIXTURES WHICH ARE SHOWN IN ADDITION TO FIXTURES <br />SHOWN ON THE PLUMBING DRAWINGS. <br />C.CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION OF <br />ALL PLUMBING LINES WITH DUCTWORK AND ELECTRICAL <br />SERVICES. <br />D.THE INSTALLATION OF ALL VALVES, UNIONS, <br />THERMOMETERS, GAUGES, OR OTHER INDICATING OR <br />RECORDING EQUIPMENT, OR SPECIALTIES REQUIRING <br />FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, <br />REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY AND <br />ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED <br />BUILDING. <br />E.CONTRACTOR SHALL NOT CUT HOLES IN STRUCTURAL <br />MEMBERS WITHOUT FIRST SECURING WRITTEN APPROVAL <br />FROM THE ARCHITECT. <br />F.ALL PLUMBING INSTALLATIONS SHALL COMPLY WITH THE <br />CALIFORNIA PLUMBING CODE, NFPA 90, AND ALL LOCAL, <br />STATE, AND FEDERAL ORDINANCES, CODES, LAWS AND <br />REGULATIONS. <br />G.ROUTE G AND CD LINES IN CEILING AS HIGH AS POSSIBLE. <br />H.CONTRACTOR TO COORDINATE WITH KITCHEN EQUIPMENT <br />DRAWINGS FOR LOCATIONS AND REQUIREMENTS OF <br />COOKING EQUIPMENT. <br />I.PAINT ALL EXPOSED CONDENSATE LINES. SEE <br />REFRIGERATION DRAWINGS FOR COOLER/FREEZER <br />CONDENSATE LINE LOCATIONS. <br />KEYED NOTES <br />GENERAL NOTES <br />1.CONDENSATE DRAIN FROM GAS FURNACE WITH P-TRAP. <br />ROUTE CONDENSATE DRAIN DOWN IN WALL AND TERMINATE <br />2" ABOVE FLOOR SINK, SLOPE PIPING 1/8" PER FT. TOWARDS <br />FLOOR SINK. <br />2.CONDENSATE DRAIN FROM GAS FURNACE WITH P-TRAP. <br />ROUTE CONDENSATE DRAIN DOWN IN WALL AND TERMINATE <br />2" ABOVE TRENCH DRAIN, SLOPE PIPING 1/8" PER FT. <br />TOWARDS TRENCH DRAIN. <br />3.APPROXIMATE LOCATION OF LOW PRESSURE GAS METER. <br />GAS METER BY GAS COMPANY, TRENCHING BY <br />CONTRACTOR. <br />4.GAS CONNECTION TO GAS FURNACE/WATER HEATER WITH <br />SHUT-OFF VALVE. <br />5.SEE REFRIGERATION DRAWINGS DOE COOLER/FREEZE <br />CONDENSATE LINE LOCATIONS. <br />6.REMOTE FILL CO2 VALVE, MOUNTED ON EXTERIOR WALL <br />WHERE IT IS EASILY ACCESSIBLE TO THE CO2 SUPPLIER AND <br />WHERE THE EXCESS CO2 PRESSURE CAN BE VENTED <br />SAFELY OUTDOORS. PIPE IN WALL ACROSS UNDERSIDE OF <br />ROOF DECK. SEE A2.10 FOR LOCATION. <br />P2.0 <br />PLUMBING PLAN - <br />GAS & CONDENSATE <br />--www.stantec.comTEL. 1383 North McDowell Blvd. Suite 250Petaluma, CA 94954707.765.1660Architecture Inc.R <br />ENGINEERING, INC <br />OBISON <br />19401 40TH AVE W., SUITE 302 <br />LYNNWOOD, WA 98036 <br />206-364-3343 tel <br />CONTACT: MARK MANGLICMOT <br />5/14/21 <br />- <br />1 PLUMBING PLAN - GAS AND CONDENSATE SCALE: 1/4" = 1'-0"